Title Page

  • Job Name:

  • Job Number:

  • Site Location
  • Conducted on

  • Prepared by

  • Photo of plans showing ITC location

  • Pole Number

  • Has the pole location been pegged by then Surveyor?

  • Have finished levels been provided on the location pegs?

  • Has the footing been installed as per manufacturer's recommendation

  • Bore the hole for Correct Diameter

  • Correct Depth attained for the Hole

  • Stub Installed

  • Pour Concrete

  • Concrete Tested

  • Standing of Poles

  • Solar Panel with Lithium Batteries built into it have been attached to the pole

  • Light installed to the pole

  • All required connections completed

  • All joints tightened/ fixed properly

  • Lift the pole and stand it on the footing once the footing is set. Fasten the bolts

Commissioning

  • FAT Test Report

  • All Procedures followed as per Manufacturers Manual

  • Lights are Operational

  • Site Acceptance Test Completed in presence of FH

Solar Poles #

  • Attach photos of the Solar Lights/ Pole installation. (E.G. Setout, Excavation, Footing, Backfill, Installation/ Completion

  • Has the site has been left clean and safe? Barricading installed where required?

  • If areas completed hand back permit and all docs.

  • Is there any issues ?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.