Title Page
-
Project Name
-
Job Number
-
Report No.
-
Date
-
Prepared by
-
Position Title
-
Location
Encountered Rock
- Rock
-
Chainage Start or Description of Start of Rock
-
Chainage End or Description of End of Rock
-
Where has the rock been encountered
-
Mark Up from Plan for the Area included in this report
-
Measurement Method
-
Give Details
-
Length (m)
-
Width (m)
-
Depth (m)
-
Approximate Volume (m3)
-
Samples Taken
-
Removal method
- Trencher
- Rocksaw
- Rock Hammer
- Excavator with Ripper
- Dozer with Ripper
- Blasting
-
In Scope or Variation
-
Client Witnessed or Informed Prior to Removal
-
Name of Client informed
-
Total time Spent Removing this section of Rock (in Hours)
-
Number of People working on the Rock Removal
-
Any Truck/ Machine used to Remove the Rock (Give Details with time)
-
Quantity of GET Tools/ Teeth used or Damaged/ Repaired (if any)
-
Add Photos
-
Onsite Sign Off: All the information's Provided is Correct