Title Page
-
Project Name
-
Job Number
-
Date
-
Prepared by
-
Position Title
-
Location
Automatic Electronic Door Testing
- Quarterly Testing of Electronic Door
-
Door Location/ Details
-
Door Make/ Model
Check the below
-
Is it 240 Volts Safe?
-
Brief the issue
-
Is Access to Operator Safe?
-
Brief the issue
-
Is Operator Secure?
-
Brief the issue
-
Is Track and Track Wheels good?
-
Brief the issue
-
Has the Anti Rise been checked and is it good?
-
Brief the issue
-
Is the bottom rail condition good?
-
Brief the issue
-
The floor guides was checked and found to be good?
-
Brief the issue
-
Is the hanger brackets secure
-
Brief the issue
-
The drive chain and belt was checked and is good?
-
Brief the issue
-
Motor/ Gear was checked and is good?
-
Are they mounted properly?
-
Brief the issue
-
Door leaves is aligned and square
-
Brief the issue
-
Mechanical locks checked and working?
-
Brief the issue
-
Electric Locks checked and working?
-
Brief the issue
-
Stop Brackets Set correctly
-
Brief the issue
-
Is the Fascia & end plates secure and aligned?
-
Brief the issue
-
Battery replaced?
-
Outdoor Operation Tested?
-
Explain why?
-
Activation Sensors Functioning Correctly
-
Brief the issue
-
Is the safety sensors functioning correctly?
-
Brief the issue
-
Power failure simulated & Test Passed?
-
Brief the issue
-
Emergency Exit Device Test Passed?
-
Brief the issue
-
Supply Voltage and Charging System good?
-
Brief the issue
-
All returned to normal operating condition
-
Brief the issue
-
Any Repairs Required
-
Give Details
-
Is there Exit Sign Above Door
-
Is the Exit Sign Working?
-
Brief the issue
-
Photos
Report Sign Off
-
Onsite Sign Off: I am Satisfied With the Tests and the Job has been completed unless otherwise noted in the comments