Information

  • Builder

  • Subdivision

  • Job Number

  • Installer

  • Inspected by:

Rough-in

  • Take Picture/Front Page Of Work Ticket Full Size

Recordables

  • Are there any issues?

  • Recordable
  • Call Type

  • Problem

  • Notes about recordable:

  • Pictures of recordable:

Equipment

  • Access Attic/Closet 23x30

  • Service Platform & Clearance (30"W) (24"W x 20'L)

  • Furnace Level/Hung as High as Possible

  • Coil Level 1" Grade to Drain Fittings/90% Furnaces 1/2"-MUST TAKE PICTURE WITH LEVEL ON IT-

  • Hangers Secured with Screws

  • Secondary Drain Pan Secured with Slope Towards PVC Termination-MUST TAKE PICTURE-

  • Drainage For 90% Equipment Install and Sealed Properly-MUST TAKE PICTURE-

  • Water Test

  • Flue Vent Run Straight up Through Roof/Level/1" Clearance

  • PVC Vent Run Straight/Properly Sealed/90% Equipment

Refrigerant Lines

  • Soldered at Coil *No Mastic*-MUST TAKE PICTURE-

  • Insulated with Armaflex

  • Strapped every 5 feet

  • Spacer Block at Roof Line

  • Centered in Wall Cavity

  • Nail Plates Installed

  • Flashing at Wall Penetration/Installed Properly

  • Flashing at Celling Penetration/Installed Properly

  • Labeled Tonnage (outside)

  • Draft Stop in Walls

  • Wire run to Equipment and Secured-MUST TAKE PICTURE-

  • Line set Pressurize With Nitrogen to 300 Pounds-MUST TAKE PICTURE-

Drain Lines

  • "P" Trap Level *No Mastic at Coil Starter*-MUST TAKE PICTURE-

  • Pipe Run Straight ( no bows)

  • Minimum 1/4" per Foot Slope

  • Strapped Every 4 Feet

  • Terminated Outside with Cap (primary)

  • Terminated over Window with Cap (secondary)

  • Nail Plates Installed

  • Draft Stop in Walls

  • Water Test

T-Tops/Caps

  • All Roof Components(T-Tops) secured together in Attic next to Equipment-MUST TAKE PICTURE-

Wiring

  • Thermostat Wire Installed 60" Off Floor-MUST TAKE PICTURE-

  • Blocked at Wall

  • Wire Run From T-stat Location to Equipment-MUST TAKE PICTURE-

  • Wire Connected and Run from Motorized Zone Dumper to Equipment/Secured-MUST TAKE PICTURE-

  • Wire Connected and Run from Fresh Air Motorized Dumper to T-stat Location -MUST TAKE PICTURE-

  • Wires Run from Temperature Sensors Location to T-stat Location-MUST TAKE PICTURE-

  • Wire Run( Jump Wire ) from T-stat Location to FRV Location-MUST TAKE PICTURE-

Ductwork/Flex

  • Plenums Secured, Sealed

  • Collars Sealed

  • Damper Disk Installed on all Collars/Equipment

  • Backdraft Dumper For FRESH AIR Installed Properly

  • Fresh Air Assembly(SONORAN VENT) Installed Properly

  • BYPASS DAMPER Installed Properly/Correct Air Flow Direction/Arm-MUST TAKE PICTURE-

  • Flex Inner Liner Sealed/Panduit Straps

  • Outer Liner Panduit Straps

  • Hanging Strap Every 4 feet

  • Bends Un-restricted

  • Flex Runs Level

  • Duct Chases Draft Stop

  • Flex Clear of Roofline

  • Flex Free of Tears

  • S/A Ceiling Boxes Installed

  • R/A Boxes Installed

  • R/A Jump Ducts Installed Bedrooms

  • Flex Joint Spliced with Metal Pipe/Collar

Exhaust Fans

  • Exhaust Fans Installed Per Plan/Bath/Landry

  • Aluminum Flex Strapped Every 4 Feet

  • Terminated Through Roof Line With 4"KD Pipe/Secured With Metal Strap and 3 Screws

  • Fan Damper Free to Close and Open

Vent Work

  • Dryer Vent Box Installed

  • Dryer Vent Box Framed by Other-MUST TAKE PICTURE-

  • Clean Cut Pipe in Box/Level/4" Long in D/Box

  • 25 Feet Max Length 4"

  • Strapped Every 4 Feet

  • Pipe Taped *No Screws* Dryers

  • Nail/Wall Plates Installed

  • Draft Stop

  • Terminated with T-Top/Wall Cap & Damper

  • Hood Vent Pipe/Wall Stack Level

  • 3 Screws per Joint/Mastic Sealed

  • Collar thru Wall for Sheetrock -2"

  • Terminated with T-Top/Wall Cap & Damper

  • Draft Stop

  • Proper Height & Location Hood Vent

Water Heater Flue Pipe

  • 1" Clearance from Combustibles

  • Strapped Every 4 Feet

  • Pipe Level

  • Insulation Standoff Installed and Secured

  • 6" Below Ceiling

Other

  • Combustion Air Vents installed/12" From Floor/Ceiling

  • QUICK-FLASH Installed Properly(PVC,etc)

  • All Wall Caps Installed/Leveled/Dumpers Free/

  • KD Pipe for Dryer Vent have Red Sticker Above Roof Line

  • PVC Vent for 90% Equipment have Red Sticker Above Roof Line/Intake Only

Notes

  • Items corrected:

  • Notes:

Finish

  • Supervisor Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.