Information

  • Builder

  • Builder

  • Subdivision

  • Job Number

  • Sonoran Issues

  • Trade Damage

  • Inspected by

  • Conducted on

  • Signature

  • Items Corrected

  • Supiversor Name

  • Supervisor Signature

  • Date

Equipment

This is the add category button at the top. It could to help break up a section into different groups.

  • Access Attic/Closet 23x30

  • Service Platform & Clearance (30"W) (24"W x 20'L)

  • Furnace Level/Hung as High as Possible

  • Coil Level 1" Grade to Drain Fittings

  • Hangers Secured with Screws

  • Secondary Drain Pan Secured with Slope towards PVC Termination

  • Flue Vent Run Straight up Through Roof/Level/1" Clearance

Refrigerant Lines

  • Soldered at Coil *No Mastic*

  • Insulated with Armaflex

  • Strapped every 5 feet

  • Spacer Block at Roof Line

  • Centered in Wall Cavity

  • Nail Plates Installed

  • Flashing at Wall Penetration

  • Flashing at Celling Penetration

  • 300 psi Pressure Test label on Line set

  • Labeled Tonnage (outside)

  • Draft Stop in Walls

  • Run Wire to Air Handler and Secured

Drain Lines

  • "P" Trap Level *No Mastic at Coil Starter*

  • Pipe Run Straight ( no bows)

  • Minimum 1/4" per Foot Slope

  • Strapped Every 4 Feet

  • Terminated Outside with Cap (primary)

  • Terminated over Window with Cap (secondary)

  • Nail Plates Installed

  • Draft Stop in Walls

  • Water Test

Water Heater Flue Pipe

  • 1" Clearance from Combustibles

  • Strapped Every 4 Feet

  • Pipe Level

  • 16" Long Insulation Standoff Secured

  • Cap, Collar, Flashing Installed

  • 6" Below Ceiling

Vent Work

  • Dryer Vent Box Installed

  • Clean Cut Pipe in Box/Level/4" Long in D/Box

  • 25 Feet Max Length 4"

  • Strapped Every 4 Feet

  • Pipe Taped *No Screws* Dryers

  • Nail/Wall Plates Installed

  • Draft Stop

  • Terminated with T-Top/Wall Cap & Damper

  • Hood Vent Pipe/Wall Stack Level

  • 3Screws per Joint/Mastic Sealed

  • Collar thru Wall for Sheetrock -2"

  • Terminated with T-Top/Wall Cap & Damper

  • Draft Stop

  • Proper Height & Location Hood Vent

  • Exhaust Fans Installed Bath/Laundry

  • Flex Strapped Every 4Feet (use 4" KD pipe for penetration thought the roof)

  • T-Top/Wall Cap & Damper Installed

  • Combustion Air Vents 12" from Floor/Ceiling

  • Fresh Air Filter Rack Accessible

  • Fresh Air Damper Installed and Wire

  • Exhaust Fan Damper Free to Open and Close

Ductwork

  • Plenums Secured, Sealed

  • Collars Sealed

  • Flex Inner Liner Sealed/Panduit Straps

  • Outer Liner Panduit Straps

  • Hanging Strap Every 4 feet

  • Flex Runs Level

  • Bends Un-restricted

  • Duct Chases Draft Stop

  • Flex Clear of Roofline

  • S/A Ceiling Boxes Installed

  • R/A Boxes Installed

  • R/A Jump Ducts Installed Bedrooms

  • Flex Joint Spliced with Metal Pipe/Collar

Wiring

  • Thermostat Wire Installed 60" Off Floor

  • Blocked at Wall

  • Nail Plates Installed

  • Terminated at Equipment

  • Wire for Zone Run and Wired at the Dampers

  • Wire for Sensors Run and Properly Installed

Notes

  • Notes:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.