Comments
-
Plots completed as per program and handed over ready for HES to start works
-
Plot inspected and ready for 1st fix
-
Report Issued to Sharepoint
-
Windows Checked
-
Report Issued to Sharepoint
-
MUC and POD inspected before and after installation works
-
Comments
-
Installation to drawings
-
Drawings
-
Kitchen installation as per kitchen drawings
-
Comments
-
Dimensions and Heights correct by use of laser level
-
Correct outlet boxes and caddy straps installed and all secure
-
LV Cables in position, labelled, neat, cable ties cut, cables secure, and with bends at 90 degrees and parallel.
-
ELV Cables in position, labelled, neat, cable ties cut, cables secure, and with bends at 90 degrees and parallel.
-
Fire stopping completed and installation with identification number labels
-
Lighting plug and play connectors fitted.
-
Ĺeak Detection Units Installed
-
Plot clear of materials and waste.
-
Snagging issues
-
Snagging items completed
-
Pendings issues
-
Plot completion
-
Harrison's
-
Berkeley Homes
-
Handover completed