Information
-
Audit Title
-
SL job#
-
Site owner/site number
-
Conducted on
-
Location
-
Prepared by
Back Haul
-
What type of back haul is this site?
Wavelength delivery
-
Where is the wavelength delivering?
-
What type of connector is the LEC handing off?
Construction
-
Start date
-
End date
-
Assigned Contractor
-
Was conduit/fiber placed to design specs?
-
Are as-builts required?
-
Picture of plans
Conduit
-
Is there conduit from the ROW to the common telco area?
-
Picture
-
Is there conduit from the SL NEMA to the LEC demarc?
-
Picture
-
Is there conduit from SL demarc to the customer demarc?
-
Picture
-
Comments
Space
-
Is there adequate space for SL gear?
-
Add media
-
What type of customer demarc is on site?
-
Picture
-
Is there an SL demarc present?
-
What type of SL demarc is on site?
-
Picture
Fiber
-
Is there fiber run from SL to the customer demarc?
-
Picture
-
Is there fiber run from the LEC demarc to the SL demarc?
-
Picture
-
Comments
Splicing
-
Is splicing complete?
-
Pictures
-
Comments
Power
-
Is power available for SL?
- +24 rectifier
- -48 rectifier
- +24 fuse panel
- -48 fuse panel
- AC outlet
- none
-
Picture of power supply
-
Comments
Grounding
-
What is the ground reading at the customer demarc?
-
Is the ground installed for the LEC?
-
Picture of ground
-
Is the ground installed SL demarc?
-
Picture of ground
Customer actions needed
-
Are any actions needed by the customer?
-
List of customer actions needed
LEC actions needed
-
Are there any actions needed by the LEC?
-
List of LEC actions needed
Southern Light actions needed
-
Are there any actions needed by SL?
-
List of SL actions needed
Additional site comments
-
Any additional site comments?
Site readiness
-
Is the site ready for OPS?
Site sketch
-
Sketch(if possible)
Sign Off
-
Auditor's signature