Title Page
-
SPC Emergency Light Testing BS-5266-1:2016
SPC Emergency Light Testing V2 Model Certificate for Verification of Existing Installations- Checklist and Report
-
Site Address
-
Responsible Person
-
Inspection Date
Check of Categories and Documentation
-
4.2- Are plans of the system available and correct?
-
6.7- Has the system been designed for the correct mode of operation category?
-
6.7- Has the system been designed for the correct emergency duration period?
-
Clause 11- Is a completion certificate available with photometric design data?
-
Clause 11- Is a test book available and are the entires up to date?
-
Comments
-
Please add pictures if applicable
Check of Design
-
4.1; 5.2.8- Are the correct areas of the premises covered to meet the risk assessment?
-
5.2.8- Are all hazards identified by the risk assessment covered?
-
5.2.8- Are there luminaires sited at the "points of emphasis"
-
5.2.2- Is the spacing between luminaires compliant with authenticated spacing or design data?
-
10.3; 10.7- if authenticated spacing data is not available for existing installations, are estimates attached and acceptable?
-
5.2.9- Are the emergency exit signs and escape route direction signs correct and the locations of other safety signs to be illuminated under emergency conditions identified?
-
6.1- Do all non-maintained luminaires operate on local final circuit failure?
-
6.3- Is there illumination from at least two luminaires in each compartment?
-
6.4- Are luminaires at least 2m above floor and avoiding smoke reservoirs?
-
5.8.2.5;;6- Are additional luminaires located to cover toilets, lifts, plant rooms, etc?
-
Comments
-
Please add pictures if applicable
Check of the quality of the system components and installation
-
6.7- Do the luminaires conform to BS EN 60598-2-22?
-
6.7- Do any converted luminaires conform to BS EN 60598-2-22?
-
6.7- Do luminaires have a suitable degree of protection for their location?
-
Clause 8- Does the installation conform to the good practice defined in BS 7671?
-
8.2.1- For centrally powered systems, is the wiring fire-resistant?
-
8.2.12- Are any plugs or sockets protected against unauthorised use?
-
7.2- If a central power supply unit is used, does it conform to BS EN 50171?
-
8.3.3- Are the test facilities suitable to test function and duration?
-
8.3.3- Are the test facilities safe to operate and do not isolate a required service?
-
8.3.3- Are the test facilities clearly marked with their function?
-
8.3.3- If an automatic test system is installed, does it conform to BS EN 62034?
-
10.7- Are the user's staff trained and able to operate the test facilities and record the test results correctly?
-
Clause 12- Does the system operate correctly when tested?
-
10.7- Has adequate documentation been provided to the user?
-
10.7- Is the user aware of action they should take in the event of a test failure?
-
10.7- Are any deviations fully documented and are they still acceptable?
-
Action recommended or deviation to be reported:
-
Comments
-
Please add pictures if applicable
-
Results of the inspection
-
Signed. By signing you confirm all works comply with BS-5266-1:2016