  • SPC Emergency Light Testing BS-5266-1:2016

SPC Emergency Light Testing V2 Model Certificate for Verification of Existing Installations- Checklist and Report

  • Site Address
  • Responsible Person

  • Inspection Date

Check of Categories and Documentation

  • 4.2- Are plans of the system available and correct?

  • 6.7- Has the system been designed for the correct mode of operation category?

  • 6.7- Has the system been designed for the correct emergency duration period?

  • Clause 11- Is a completion certificate available with photometric design data?

  • Clause 11- Is a test book available and are the entires up to date?

  • Comments

  • Please add pictures if applicable

Check of Design

  • 4.1; 5.2.8- Are the correct areas of the premises covered to meet the risk assessment?

  • 5.2.8- Are all hazards identified by the risk assessment covered?

  • 5.2.8- Are there luminaires sited at the "points of emphasis"

  • 5.2.2- Is the spacing between luminaires compliant with authenticated spacing or design data?

  • 10.3; 10.7- if authenticated spacing data is not available for existing installations, are estimates attached and acceptable?

  • 5.2.9- Are the emergency exit signs and escape route direction signs correct and the locations of other safety signs to be illuminated under emergency conditions identified?

  • 6.1- Do all non-maintained luminaires operate on local final circuit failure?

  • 6.3- Is there illumination from at least two luminaires in each compartment?

  • 6.4- Are luminaires at least 2m above floor and avoiding smoke reservoirs?

  • 5.8.2.5;;6- Are additional luminaires located to cover toilets, lifts, plant rooms, etc?

  • Comments

  • Please add pictures if applicable

Check of the quality of the system components and installation

  • 6.7- Do the luminaires conform to BS EN 60598-2-22?

  • 6.7- Do any converted luminaires conform to BS EN 60598-2-22?

  • 6.7- Do luminaires have a suitable degree of protection for their location?

  • Clause 8- Does the installation conform to the good practice defined in BS 7671?

  • 8.2.1- For centrally powered systems, is the wiring fire-resistant?

  • 8.2.12- Are any plugs or sockets protected against unauthorised use?

  • 7.2- If a central power supply unit is used, does it conform to BS EN 50171?

  • 8.3.3- Are the test facilities suitable to test function and duration?

  • 8.3.3- Are the test facilities safe to operate and do not isolate a required service?

  • 8.3.3- Are the test facilities clearly marked with their function?

  • 8.3.3- If an automatic test system is installed, does it conform to BS EN 62034?

  • 10.7- Are the user's staff trained and able to operate the test facilities and record the test results correctly?

  • Clause 12- Does the system operate correctly when tested?

  • 10.7- Has adequate documentation been provided to the user?

  • 10.7- Is the user aware of action they should take in the event of a test failure?

  • 10.7- Are any deviations fully documented and are they still acceptable?

  • Action recommended or deviation to be reported:

  • Comments

  • Please add pictures if applicable

  • Results of the inspection

  • Signed. By signing you confirm all works comply with BS-5266-1:2016

IA-04-21b

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.