Information
-
Document No.
-
Project name
-
DIS job number
-
Conducted on
-
Client
-
Contractor
-
Personnel
- Brandon Rogers
- Jim Rogers
-
Staff
- Ben
- Matt
- Lee
-
Personnel
- Kelvin
- Marty
- Chris
- Billy
- Darren Orves
- Shaun Strange
-
Personnel
- Kelvin
- Marty
- Chris
- Billy
- Darren Orves
- Shaun Strange
-
New Personnel (full name + CSCS + NRSWA)
-
Location
-
Prepared by
-
DIS Supervisor
- Marcus Bryant
- Matt Loxton
Site appearance
-
Is the site safe?
-
Is Traffic Management required?
-
TM Provider
-
Is Chapter 8 required?
-
Are signs correct<br><br><br>
-
Are signs secure / sandbagged?
-
Are signs / Cones Clean & Visible?
-
Are Barriers Correct / Secure?
-
Are DRAGON INFO boards in place?
-
Are Pedestrian routes clearly identified?
-
Are Pedestrian routes minimum width? (1m)
-
Are the pedestrian routes clear from obstructions?
-
Are Provisions in place for Disabled / Wheelchairs / Mobility? (Ramps)
-
Is the site clean and tidy?
-
Add media
-
Temporary Traffic Lights?
-
TM Provider
- Nationwide Traffic Solutions
- Forest TM
- Signal TM
-
PTL control
-
Is traffic flowing correctly? Settings correct?
Materials
-
Are all materials as per Design/DNO spec?
-
Are all materials stored correctly?
-
Have materials been checked with delivery note?
Other Information
-
Add media