Title Page

  • Greco site assesed

  • Conducted on

  • Prepared by

  • Walk through / Review of findings conducted with:

Untitled Page

Administrative

  • Safety Huddles and Coach Cards for the week have been reviewed, site is on pace to meet minimum required amounts.

  • Findings / Improvement recommendation:

  • Pre-shift warm up routines are being conducted

  • Findings / Improvement recommendation:

  • All Origami incidents have appropriate reports; Auto Liability (AL) and Auto Physical Damage (APD) claims have photographs.

  • Findings / Improvement recommendation:

SPCC Inspection

  • Used absorbent material has been cleaned up and properly disposed of.

  • Findings / Improvement recommendation:

  • The floor and adjacent areas are free of any evidence of release.

  • Findings / Improvement recommendation:

  • Spill kits are located in close proximity to where the container or equipment.

  • Findings / Improvement recommendation:

Oil Containing Drums

  • The drums show no evidence of release, staining, corrosion, bulging and / or buckling.

  • Findings / Improvement recommendation:

  • Oil containing drums are not placed on spill pallets.

  • Findings / Improvement recommendation:

Hydraulic Elevators

  • The reservoir and pipes show no evidence of a release, staining, corrosion, bulging and / or buckling.

  • Findings / Improvement recommendation:

Emergency Generators (Day Tanks)

  • The tanks, waste oil vessels, and / or overflow tanks show no evidence of a release, staining, corrosion, paint failures, bulging and / or buckling.

  • Findings / Improvement recommendation:

  • The day tank containment structures do not contain any leaked product.

  • Findings / Improvement recommendation:

  • There is no evidence of a leak from any of the pipes or valves associated with the day tanks.

  • Findings / Improvement recommendation:

Above-ground Storage Tanks (ASTs)

  • There is no staining beneath the product reservoir.

  • Findings / Improvement recommendation:

  • The AST does not show evidence of paint failure, pitting, or corrosion.

  • Findings / Improvement recommendation:

  • The AST does not show evidence off bulging, buckling, or any other structural abnormalities.

  • Findings / Improvement recommendation:

  • The AST containment area does not contain any debris such as dirt, leaves, trash, etc.

  • Findings / Improvement recommendation:

  • The AST containment area does not contain any leaked product.

  • Findings / Improvement recommendation:

  • The above-ground piping, fittings, valves, pipe seams, flanges, threaded connections, pumps, etc. contain no visible leaks, paint failures, corrosion, or cracks.

  • Findings / Improvement recommendation:

  • The containment drain valves are not unlocked or unsecure.

  • Findings / Improvement recommendation:

  • Motor oil or maintenance drums are in good condition and show no signs of release.

  • Findings / Improvement recommendation:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.