Title Page
-
SPS 3 Monthly Safety Shower & Eye Wash Stations
-
WO Number
-
Date
-
Person/s Performing Inspection
Untitled Page
SPS 3 Monthly Safety Shower & Eye Wash Stations
-
Waste Transfer Station (safetyman)
-
Ignition oil receival area (PRATT)
-
3/4 Slurry mixing tanks (safetyman)
-
1/2 Slurry mixing tanks (safetyman)
-
Main workshop next to store
-
Flammable liquids store (PRATT)
-
Main store north corner (PRATT)
-
Waste oil storage area (PRATT)
-
Lab (PRATT)
-
Lab store room (PRATT)
-
Regen resin holding vessel (PRATT)
-
Demin plant bulk storage (PRATT)
-
Hydrochloric acid storage (PRATT)
-
Sulphuric acid pumps (PRATT)
-
Caustic soda pumps (PRATT)
-
CRW Plant (safetyman)
-
Chem, effluent plant (PRATT)
-
Liquid alum storage (PRATT)
-
Chem dosing plant (PRATT)
-
Hypo dosing area (PRATT)
-
3/4 cooling tower unit 4 outlet (PRATT)
-
3/4 cooling tower unit 3 outlet (PRATT)
-
1/2 cooling tower unit 2 outlet (PRATT)
-
1/2 cooling tower unit 1 outlet (PRATT)
-
Boiler 1 ground floor (PRATT)
-
Boiler 2 ground floor (PRATT)
-
Boiler 1 Level 1 (PRATT)
-
Turbine 1 Di-iso-proplamine (PRATT)
-
Battery room unit 1/2 (safetyman)
-
Wet rack room 1/2 (safetyman)
-
Station battery room (safetyman)
-
Boiler 2 Level 1 (PRATT)
-
Boiler 3 Level 1 (PRATT)
-
Boiler 4 Level 1 (PRATT)
-
Turbine 4 Di-iso-proplamine (PRATT)
-
Battery room unit 3/4 (safetyman)
-
Wet rack room 3/4 (safetyman)
-
Boiler 3 ground floor (PRATT)
-
Boiler 4 ground floor (PRATT)
-
UPS building turbine road (SPEAKMAN)
-
Mechanics shed (ENWARE)
-
CRW plant eyewash (safetyman)