Information

  • Project Reference

  • Date of Survey

  • Customer Name

  • Customer Address
  • Site Address [if different from above]
  • Telephone Number

  • Mobile Number

  • Email Address

PLANNING

  • Is the property listed or in a conservation area?

  • Will the installation come under permitted development?

  • Are there any other planning issues to be considered?

  • Is the current roof lining under an active warranty? If yes, the warranty provider should be consulted as to whether the installation of the system will void or in any way affect the warranty.

SYSTEM DESIGN

  • Building Use

  • Building Type

  • HOW MANY STORIES?

  • Build Type

  • Size of system desired/proposed [kWp]

  • Array Location

  • Proposed Mounting System

  • Tile Type

  • Scaffolding required?

  • Area to be scaffolded

  • ROOF ASSESSMENT
  • General roof condition

  • General Loft Condition

  • Access To The Loft

  • Is The Property In An Exposed Location?

  • Orientation [Variation From South]

  • Inclination [Variation From Horizontal]

  • Roof Slope Length [Ridge To Eves] [mm]

  • Lower Width - Gable To Gable [mm]

  • Upper Width [mm] - If Different

  • Gutter Height Above Ground [m]

  • Are There Any Obstacles That May Cause Shading Issues? [Chimneys, Windows etc]

  • Is There A Likelihood That Significant Overshadowing Issues Could Occur In The Future? [Tree Growth]

  • Are There Any Access Issues?

STRUCTURAL

  • Roof Structure Type

  • Roof Pitch

  • Rafter Spacing

  • Rafter Width

  • Rafter Depth

  • Longest Clear Span Of Rafter [Between Supports / Wall Plates] [m]

ELECTRICITY CONSUMPTION

  • Current Electricity Supplier

  • Current Cost Per kWh

  • Annual Electricity Usage [kWh]

  • Occupancy Archetype

  • Copy Of Clients Electricity Bill

  • Is The Property On A Split Load Tariff? [Economy 7 / EV]

  • Last 12 Months Readings For On Peak Tariff [kWh]

  • Last 12 Months Readings For Off Peak Tariff [kWh]

  • Is Microgeneration Already Installed?

  • Does The Property Have Electric Space Heating, Electric Hot Water or Electric Vehicle Charging Loads?

  • Are 12 Months Electricity Readings Prior To The Installation Of These Loads Available?

BATTERY STORAGE

  • Battery Storage Required?

  • Nominal Capacity Of Battery Storage [kWh]

ELECTRICAL ASSESSMENT

  • Upload Photo Of Electricity Meter & Cut Out

  • Main Fuse Rating

  • Main Earthing Arrangement

  • Main Earthing CSA

  • Distance From Consumer Unit To Proposed Location Of Inverter [m]

  • Is Water Bonding In Place?

  • Is Gas Bonding In Place?

PROPOSED LOCATION OF KEY COMPONENTS

  • Proposed Method Of Connection

  • Proposed Location Of Inverter

GENERAL

  • Any Additional Information

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.