Information

ELF2B - 2CER

  • Document No.

  • Conducted on

  • Prepared by

  • Location
  • Personnel in Attendance

1) Access, Egress & Housekeeping

  • - Access and egress to work area is clear of obstruction and easily defined
    - Work areas are orderly and free from trip hazards (e.g. tools and rubbish)
    - Materials are stored in a neat and orderly state
    - General work area is clear of trip hazards and any rubbish or off-cuts do not affect access
    - Waste bins are available for use and not overflowing, correctly used
    - JHG entry signs are located at appropriate locations to work area
    - Are there separate entry points for pedestrians and vehicles
    - Working platform/s clear from obstructions

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

2) Behaviour & Work Habits

  • - Workers and assisting persons are wearing mandatory PPE
    - Worker is using task specific PPE
    - Worker is not taking any obvious risks
    - Right tool for the task

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

3) SQE Risk Management

  • - START Cards have been appropriately completed
    - START Cards have been reviewed by crew leader (initially)
    - TRA is present at each work location
    - Workers have signed onto the TRA
    - TRA has been reviewed (if > than one week duration)
    - AMS is available for the work team to review
    - SEP is available as required

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

4) Excavation & Trenching

  • - A current Excavation and Trenching Permit is available for any ground breaking / penetrating work activities
    - Each Plant Operator carrying out ground penetrating works has read, understood and signed the Excavation and Trenching Permit
    - Edges are appropriate battered, benched or shored
    - Stock piles are appropriate distance from edge
    - Barricades, fencing securing excavation adequate to prevent people from entering the excavation or trench
    -Underground services identified, positively marked and isolated where possible
    -Safe means of access and egress maintained (ladders, stairs or ramps for excavations greater than 1.2m in depth. Ladders must extend 900mm above the surface and at 9 metre intervals.
    -Daily inspections carried out for all excavations over 1.5 metres in depth

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

5) Mobile Powered Plant

  • - Daily Inspection completed and any faults recorded
    - Plant Hazard Assessment completed and available (PHA Sticker)
    - Beacons and motion alarms are operational
    - Plant operations are appropriately isolated or separated from adjacent work activities
    - Spotter is in place for plant operations where plant operation can not be controlled by other means
    - Plant operators are not operating when using a mobile phone
    - Operator holds applicable license / competency and the competency has been verified
    - Plant has fire extinguisher
    - Appropriate traffic control signage in place
    -Overhead services and structures identified with appropriate control measures implemented to prevent collision by plant and vehicles
    -Pedestrian / vehicle crossing points clearly identified and controlled
    -Loading/unloading zones clearly delineated with controls to prevent unauthorised access
    -Effective communication between plant operators and ground controllers

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

6) Tools & Equipment

  • - Tools and Equipment are appropriate for the task being undertaken and free from obvious damage
    - Oxy / acetylene sets have flash back arresters fitted
    - Fixed / retractable blade knives are not being used (Stanley Knives)
    - Fire Extinguishers are tested every 6 months

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

7) Lifting Equipment & Operations

  • - Lifting Equipment is appropriate to the task and ready to use
    - Lifting device is tagged / identified with SWL / WLL
    - Dogman / Rigger holds the relevant competency and has been verified
    - No loads being lifted over people
    -Cranes/lifting appliances regularly inspected, certified, tested and maintained.
    -Pre-start inspection and/or function test completed
    -Physical barriers and/or other suitable controls in place to exclude unauthorised persons from lifting operations.
    -No loads lifted or suspended over people
    -Ground conditions assessed with controls in place to stabilise equipment
    -Tag lines used on loads which are liable to swing whilst being hoisted
    -All rigging equipment kept in good order and condition and defective gear replaced or tagged and marked for repair.
    -3 monthly plant inspection on plant sticker has been signed and dated

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

8) Electrical & Lighting

  • - Equipment is tagged and in test date
    - RCD is fitted to mains supply or portable generators
    - Leads are run out correctly off the ground and supported on insulated stands or hooks
    - No lead extends > 35 meters and are fitted with clear shrouded plugs with LED indicator
    - Access and / or task lighting is adequate and work lights have protective cage or diffuser
    -Electrical supply panels fixed and secured to prevent unauthorised access. RCD and circuit breakers locked
    -No piggybacking or double adapters

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

9) Hot Works & Welding

  • - Hot Works Permit is current and available
    - Suitable fuel reduction and fire fighting provisions in place
    - Oxy and other bottles stored up right and secured
    - Oxy / Act bottles on trolley with flash back arrestors at bottle & torch + extinguisher
    - Welding signs are set out in appropriate locations
    - Weld returns completed
    -Area free of fire hazards

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

10) Working Platforms & Fall Protection

  • -Incomplete scaffold sign posted
    -Scaffold tied in at regular intervals or mobile assembled correctly using check sheet
    -Toe boards fitted when > 2m high
    -Scaffold have base-plate or screw jacks
    -Scaffolds adequately braced
    - No gaps > 225mm between perimeter edge and scaffold. <6m metres from rail (fibre glass)
    - Edges are appropriately delineated and barricaded
    - Edge protection in place is appropriate for the protection required
    - Penetrations are covered, secured and handrailed with applicable signage
    - Platform ladder in good condition, Industrial rated (120kg) and set up correctly

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

11) Work at Heights

  • - Personnel working at height are using the correct fall prevention equipment
    - Fall restraint / arrest equipment is certified and in date
    - Method of working at height follows the Hierarchy of Controls for working at height
    - Work at Height Permit has been issued and is in date
    - Work at Height / EWP Rescue Plan has been developed for the works
    - Personnel conducting work at height have been trained (within 1 year)
    -Penetrations, shafts and risers protected to prevent the fall of people and material. Covers must be robust, securely fastened and identified (signage)
    -Grid mesh or flooring material installed as per design requirements, secured at all stages of installation, and regularly inspected.
    -Roof mesh is not used as a primary means of fall protection.

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

12) Chemical & Dangerous Goods

  • - Hazardous Substances are stored correctly
    - Flammable substances stored in bundled area
    - Refuelling is conducted in appropriate area with TRA in place
    - SDS's are available to the work crew
    - Spill Kit is available at the work location
    - No evidence of previous spills

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

13) Environmental Management

  • - Controls in place where there is a risk of pollution of waterways
    - Erosion and sedimentation controls in good working order
    - No evidence of polluted water leaving the work area

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

13) Emergency Procedures

  • - Fire Warden posters displayed and contact details listed
    -Emergency checklists (bomb threat, chemical, radiation etc) readily available
    -First aid kits accessible and checked and re- stocked regularly
    -First aid posters displayed and contact details listed
    -First aid areas kept clean and tidy
    -Eye wash stations and deluge showers regularly maintained
    -Evacuation points clearly identified

  • Are there issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Contractor Responsible

  • Close-out Time Frame

  • Signature once item fixed / closed

  • Are there further issues with this category

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.