Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Add location
Form/Footing inspection
-
Date of Inspection
-
Soil conditions at footing level
-
Footing depths of not < 18" (frost)
-
Footing sizes and locations as per plan
-
Registered professional inspection reports
-
Reinforcement as per engineering drawings
-
Other
-
Inspector Info
-
Inspection Status
Damproofing/Drain tile inspection
-
Select date
-
Site drainage plan
-
Damproofing to finished grade
-
Type and size of drain pipe
-
Dry well or Rain garden installed as per drainage plan
-
Pipe bedding and silt management
-
Select date
-
Acceptable leader locations
-
Registered professional inspection report
-
Other
-
Add signature
-
Inspection Status
Services connection
-
Select date
-
Depth of pipe below frost line
-
Pipe material and bedding
-
Connections and water test
-
Meter box inspection
-
Water inspection
-
Water on/off
-
Storm inspection
-
Sanitary inspection
-
Other
-
Add signature
-
Inspection Status
Rough in Plumbing
-
Select date
-
Piping, slope, materials and sizing
-
Pipe layout and arrangement
-
Pipe Support and protection
-
Water Pressure test
-
Trap primers where required
-
Check valve assemblies
-
Venting <br>
-
1 -3" vent pipe through all floors
-
Plumbers declaration
-
Other
-
Add signature
-
Inspection Status
Water distribution
-
Select date
-
Pressure tests 200 lbs
-
Piping material approved<br>
-
Piping support
-
Freeze protection
-
Other
-
Add signature
-
Inspection Status
Framing
-
Select date
-
Registered professional inspection reports
-
Sealed truss drawings
-
Stamped drawings on site for inspection
-
Roof truss/rafter/joist installation and bracing
-
Roof beam construction and assembly
-
Roof sheathing
-
Roof ventilation
-
Roof point loads to foundation
-
Attic access ( quote code reference)
-
Exhaust fan insulated and terminated
-
Wall Framing<br>materials,<br>,spacing openings<br>,lintels,
-
Fire blocking/fire stop
-
Loads carried down to foundation
-
Sill plates separated from concrete and hold downs
-
Cut notched and drilled members
-
Door and window rough-in sizes
-
Stair construction: rise/run/headroom
-
Smoke alarm locations, rough in locations
-
Fireplace: framing/clearances
-
Masonry chimneys for solid fuel: liners and clean-outs
-
Confirm fire dampers are located in duct at fire seperations
-
Ramps, slopes, accessibility
-
Height of foundation walls above grade
-
Mechanical Protection or Siding before Insulation
-
Other
-
Add signature
-
Inspection Status
Insulation/ Vapour barrier
-
Select date
-
RSI value, type and installation
-
Cross ventilation
-
Continuous vapor barrier
-
Sealed at all openings and plates
-
Other
-
Add signature
-
Inspection Status
Occupancy Inspection
-
Select date
-
Application complete
-
Schedules/ Field reports/Insurance
-
Electrical final inspection<br>
-
Gas Final inspection
-
Final Survey
-
-
-
-
Building Access/Egress
-
Other
-
Occupancy Approved
-
Add signature
-
Inspection Status
Final
-
Lot Grading
-
Curb and Sidewalk inspection
-
-
-
All outstanding documents received
-
Other
-
Final Approval
-
Add signature
-
Inspection Status