Title Page
-
Audit Title
-
Conducted on
-
Has the plan been handed over as completed?
-
Are the plans left up for sign off?
-
Has the plan been pulled/manually mapped?
-
Is the backstocks fully worked?
-
Is the delivery fully worked?
-
Is there a sisel for every shelf?
-
Are there any missing labels?
-
Are all labels aligned?
-
Are all facings correct on label?
-
Has all damaged stripping been replaced?
-
Is the stripping and shelving clean?
-
Are the new bubbles displayed?
-
Are all the Northern Ireland indicators displayed? And at the right products?
-
Are the air gaps to the right of the shelf?
-
Does the height of the shelves ensure no more than 1.5cm air gap?
-
Have all not on plans/discontinued been fitted in to the right of the mod and documented on the plan?
-
Have all reduced to clear products and labels been removed from the fixture?
-
Have the plans been accurately implemented against what has been written on the plan sheets?
-
Is there any new equipment missing from the plans?
-
Has the aisle been left clean and tidy?
-
Has all loose backstocks been shrink wrapped and left tidy in warehouse?
-
Has all reduced to clear products been fitted into RTC section? Any anything that will not go out put into totes and labeled RTC?
-
Has a line manager and a member of senior team signed this plan off together?
-
Additional comments and/or feedback
-
Next steps