Information

  • Division

  • Community

  • Homesite address
  • Take photo from street

  • Installation Contractor

  • Conducted on

  • Prepared by

Exterior

Finished Array

  • We're the correct end clamps used?

  • Is the rail trimmed to be no more than an inch past the end clamp?

  • Is the array straight and in a consistent plain?

  • Sufficient wire management to ensure no dangling wires?

  • Critter guard/ mesh secured with no openings?

  • Is the roofing material around the array free of damage and visible defect?

  • Take Photo

Exterior BOS

  • DANGER electrical equipment may be energized. Wear proper PPE and follow appropriate safety protocol.

  • Electrical panels, meter housing, disconnect switch mounted straight and secure?

  • All wire terminations secure?

  • Labeling complete according to SPP's and local utility/municipal requirements?

  • Take Photo

Interior

Monitoring

  • Cat5 cable terminated properly?

  • Envoy mounted securely?

  • All wires connected/plugged in?

Completion Summary

  • Overall Craftsmanship from 1-10

  • List any follow up required:

  • Auditor Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.