Division
-
Community
-
Homesite address
-
Take photo from street
-
Installation Contractor
-
Conducted on
-
Prepared by
Exterior
Finished Array
-
We're the correct end clamps used?
-
Is the rail trimmed to be no more than an inch past the end clamp?
-
Is the array straight and in a consistent plain?
-
Sufficient wire management to ensure no dangling wires?
-
Critter guard/ mesh secured with no openings?
-
Is the roofing material around the array free of damage and visible defect?
-
Take Photo
Exterior BOS
-
DANGER electrical equipment may be energized. Wear proper PPE and follow appropriate safety protocol.
-
Electrical panels, meter housing, disconnect switch mounted straight and secure?
-
All wire terminations secure?
-
Labeling complete according to SPP's and local utility/municipal requirements?
-
Take Photo
Interior
Monitoring
-
Cat5 cable terminated properly?
-
Envoy mounted securely?
-
All wires connected/plugged in?
Completion Summary
-
List any follow up required:
-
Auditor Signature: