Welcome

  • Division

  • Community

  • Address or Homesite
  • Take photo of home from street

  • Installation Contractor

  • Date and Time

  • Audit Performed By

Sections

To be inspected on the roof prior to module installation

Flashings

  • Installed to reach the second course of shingles?

  • Layout matches Solar Plot Plans?

  • Proper sealant used?

  • Take Photo

Rail/Racking

  • Layout matches Solar Plot Plans?

  • All structural hardware present and secure?

  • Splice Kits installed correctly?

  • Take Photo

Bonding

  • Check box if present:

  • Ground lugs

  • Bonding Jumpers

  • Grounding Electrode Conductor (GEC)

  • Take Photo

Wiring

  • Inverter cables secured with provided wire management clips?

  • Waterproof penetrations into Soladeck combiner box?

  • Soladeck flashed properly?

  • Take photo

New Items

To be inspected in the home prior to insulation and drywall

Electrical Rough

  • Romex secured at proper intervals?

  • Combiner and outlet boxes mounted securely and in correct location?<br>

  • Romex terminated with sufficient length for service and connections?

  • Wire fasteners installed correctly and not smashing Romex?

  • Nail plates installed where wire could be at risk of future damage

  • Interior boxes mounted with face 3/8" past studs to clear drywall?

Low Volt / Data Rough

  • Terminated in correct location?

  • Labeled properly?

Smart Fields

  • Overall craftsmanship from 1 to 10

  • List any follow up required:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.