Information
-
Conducted on
-
Location:
-
Jst #:
-
County:
-
Statoil Site Representative (Day):
-
Statoil Site Representative (Night):
-
Statoil Safety Representative:
-
Contractors Working on Location:
-
Stage of Drill-Out:
-
Weather Condition on Location:
- Wet
- Dry
- Frozen
Inspection Checklist
Applicable Permits:
-
JSA / SJA Completed for Each Contractor on Location with Contractor Sign-In Sheet?
-
Hot Work Permit Completed?
-
Confined Space Permit Completed and Posted?
-
Critical Lift Permit Completed?
-
Ground Disturbance Permit Completed?
Signage:
-
Proper Signage in Place at the Entrance to Location?
-
No Smoking Signs and Designated Smoking Areas Signs posted?
-
Proper PPE Signage posted at entrance?
-
"Hearing Protection Required" Warning Signs are Properly Poseted?
-
Muster area Designated?
-
Warning Signs Clean and Visable?
-
Tank Battery Signs Posted?
-
Emergency Contact Information Posted on Location?
-
OSHA Poster Posted?
General Site Inspection:
-
LEL and H2S Monitors Deployed?
-
Statoil 350lbs Fire Extinguishers Deployed?
-
Statoil 30lbs Fire Extinguishers Deployed?
-
Material Safety Data Sheets (MSDS) and Shipping Papers are on Location and Easily Accessible?
-
There are No Fluid Leaks, Discharges or Spills on Location?
-
Adequate Lighting Provided?
-
Interior / Exterior Berms Present on Location?
-
There are No Trip Hazards?
-
All Vessels Labeled as to their Contents?
-
Proper PPE/FRC being worn by all personnel on Location?
-
Is a Clean and Sanitary Portable Restroom Facility provided in close proximity to the location?
-
Erected Windsock Visable?
-
Production Equipment Set?
-
Hearing Protection Provided and Available?
-
Fall Protection being utilized when Required?
-
First Aid Kit and Blood Born Pathogen Kit available on Location?
-
Are Proper Tools being Utilized for the Job at Hand?
-
Are all Tools in Proper Working Condition?
-
Adequate Handrails provided on stairs with 4 or more Risers?
-
Stairs have Non-Skid Steps and are uniform size?
-
Proper Lifting Mechanics are being Used by Personnel?
-
Dead-Men are Properly Marked with Visible Yellow Stakes?
-
Housekeeping is Good in all Work Areas?
-
Backup Alarms are Working Properly on Material Handling Equipment?
-
Seat-belts are being Used by Operator of Material Handling Equipment?
-
All Parked Vehicles are Properly Chocked?
-
Back-In Parking is being Utilized on Location?
-
Spotters are being Utilized on Location?
-
Fire Extinguishers are Properly Placed and have Current Inspection Tags?
-
Whip-Check are in Place and Cement Blocks are Set on High Pressure Lines?
-
Trucks Observing 5mph Speed Limit on Location?
-
Water-Haul Supervisor Present on Location?
Fueling Vehicles:
-
Fuel Storage Tanks Properly Located and Labeled as to their Contents?
-
Grounding and Bonding is being Utilized when Refueling Equipment or Vehicles?
-
Discharge Valves, Nozzles and Hoses in Good Working Condition?
-
"Flammable" Warning Signs Properly Posted on All Sides of Storage Tanks?
Electrical:
-
All Electrical Equipment, Trailers and Generators are Properly Grounded?
-
All Electrical Equipment Properly Marked as to its Function?
-
"High Voltage" Warning Signs Properly Posted?
-
LOTO Devices Provided and Available?
-
All Electrical Wiring is off the Ground?
-
All Electrical Cords, Receptacles, and Plugs in Good Working Condition?
-
All Exterior Electrical Outlets are Covered?
Rig Inspection:
-
Derrick Lights and Crown Light are in Good Working Condition?
-
Wind Walls are Erected and Placed Properly?
-
Locking Nuts are Properly Tightened on All Hydraulic Leveling Jacks?
-
Safeguards Properly Installed over all Moving Parts?
-
Pipe Racks are Level and Secured with Chocks in Place for Pipe?
-
Pipe Wrangler is Level and Secure?
-
Danger Area around Pipe Wrangler is Properly Marked?
-
All Fuel Tanks are Stored at the Proper Distance from Ignition Sources?
-
Are the guy lines properly secured?
-
Guy-Lines are Properly Clamped?
-
Operator is at Controls?
-
Tool Pusher is Present on Location?
-
All Equipment with Motors are Located at Least 50ft from Well-Head or Ignition Source?
-
Pump is Located at Least 50ft from Well-Head and Rig Tank?
Snubbing Unit:
-
Snubbing Truck has Emergency Egress?
-
Snubbing Truck is Properly Chocked?
-
There are No Leaks on the Snubbing Unit?
Additional Findings:
Additional Findings / Issues or Concerns:
-
Issue #1:
-
Add media
-
Issue #2:
-
Add media
-
Issue #3:
-
Add media
-
Issue #4:
-
Add media
-
Issue #5:
-
Add media
-
Issue #6:
-
Add media
-
Issue #7:
-
Add media
-
Issue #8:
-
Add media
-
Issue #9:
-
Add media
-
Issue #10:
-
Add media
Approval:
-
Statoil Safety Representative:
-
Company Man:
-
Tool Pusher:
-
Contractor Supervisor / Foreman: