Information
-
Prepared by
-
Phone Number
-
Date/Time Permit Initiated
-
Date/Time Permit Expires
-
Location Name:
-
Century Supervisor
-
Phone Number:
-
State Oil Representative
-
Phone Number:
-
Emergency Contact Phone Number:
-
Alternate Phone Number
Utilities
One-Call Locate
-
Requested by
-
Phone Number:
-
When was One-Call notified
-
Locate Ticket Number
Utility Owners
-
Owner
-
Utility Owner
-
Type of utility
- Communications
- Electrical
- Potable Water
- Non-Potable Water
- Sewer
- Pipeline - Gas
- Pipeline - Crude Oil
- Other
-
Type of utility
-
Name of Locator
-
Contact number
Administration
-
Description of work to be performed
Status Report: NOTE: for any item answered "NO" a Statoil Manager must Approve before work proceeds
-
1. One-Call has been notified and contacts have been made to determine the existence and location of ALL underground facilities in the vicinity of the work area.
-
Statoil Manager contacted
-
Directives given
-
This is not an allowable answer
-
2. Available records have been referenced and a plot plan indicating the location of all underground facilities has been provided and is available for reference at the work site.
-
Statoil Manager contacted
-
Directives given
-
2a. Have Area Operations Personnel been consulted for obtaining or discussing: Plot Plans<br>
-
Directives given
-
Statoil Manager contacted
-
This is not an allowable answer
-
2a. Have Area Operations Personnel been consulted for obtaining or discussing: Pipeline or Facilities Maps
-
Directives given
-
Statoil Manager contacted
-
This is not an allowable answer
-
2a. Have Area Operations Personnel been consulted for obtaining or discussing: Lease Maps (as available)
-
Statoil Manager contacted
-
Directives given
-
2b. Has the work area been checked for facilities/pipelines, or utility markers
-
Directives given
-
Statoil Manager contacted
-
This is not an allowable answer
-
2c. Has the company on the markers been contacted?
-
Directives given
-
Statoil Manager contacted
-
This is not an allowable answer
-
2d. Are there any signs of ground disturbance within the proposed work area, including the search zone?
-
Statoil Manager contacted
-
Directives given
-
2e. Have attempts been made to communicate with the landowner and/or tenant to establish verification of buried utilities?
-
Statoil Manager contacted
-
Directives given
-
3. All approvals, notifications and agreements have been obtained
-
Directives given
-
Statoil Manager contacted
-
This is not an allowable answer
-
4. A pre-job safety meeting, including Safe Job Analysis has been conducted by the Competent Person.
-
Directives given
-
Statoil Manager contacted
-
This is not an allowable answer
-
5. The Emergency Response Plan has been reviewed and is available at the work site. When applicable, the nearest pipeline isolation valves identified and incorporated into the plan.
-
Directives given
-
Statoil Manager contacted
-
This is not an allowable answer
-
6. The proposed ground disturbance area(s) have been identified and all underground facilities in the dig zone and search zone have been identified and incorporated into the plan.
-
Statoil Manager contacted
-
Directives given
-
This is not an allowable answer
-
7. Approved techniques for exposing underground facilities within 2 feet of ground disturbance have been (or will be) used to verify the location of all known underground facilities.
-
Statoil Manager contacted
-
Directives given
-
8. Other Safe Work Permits, as applicable, have been issued (Confined Space, Hot Work, LOTO, etc.)
-
Statoil Manager contacted
-
Directives given
-
9. Precautions have been taken to prevent contact with overhead power lines.
-
Statoil Manager contacted
-
Directives given
-
10. Appropriate internal communications (team leader, field tech, land owner, etc.) have taken place.
-
Directives given
-
Statoil Manager contacted
-
This is not an allowable answer
-
11. New non-metallic underground facilities are being installed with line locating capability.
-
Statoil Manager contacted
-
Directives given
-
12. All personnel involved with the excavation have received the appropriate training.
-
Directives given
-
Statoil Manager contacted
-
This is not an allowable answer
-
13. Risk has been assessed, and provisions have been/will be made to address unattended open excavations to insure the safety of the general public, livestock and wildlife until the site is remediated.
-
Statoil Manager contacted
-
Directives given
-
This is not an allowable answer
-
Additional comments, Instructions or requirements:
Plot Plan
-
Legend
-
Plot Plan Drawing
-
Plot Plan Image
-
Drawn By:
Permit Execution
-
Once this form has been fully completed it must be authorized by by the designated Statoil Manager or Supervisor at the beginning of the aforementioned work day.
-
Check if Statoil Manager or Supervisor is not available
-
Statoil Manager/Supervisor Contacted by phone:
-
Directives given:
-
Date and time of phone call
-
The provisions of this permit have been discussed with the following people:
(include everyone that is currently working on said ground disturbance)
Person
-
Add signature