Title Page
-
Site conducted
-
Client
-
Project Name
-
Team
-
Inspector’s Name
-
Location
-
Date
-
Inspection Type
Site Safety Inspection Checklist
-
INSTRUCTIONS
----------------------
1. Please answer all the questions below.
2. Add photos and notes by clicking on the paperclip icon
3. To add a Corrective Action click on the paperclip icon then "Add Action," provide a description, assign to a member, set priority, and due date
4. Complete audit by providing digital signature
5. Share your report by exporting as PDF, Word, Excel or Web Link
Welfare Facilities
-
Proprietary Welfare facilities compliant to CDM Regs 2015 on site.
Site Documentation
-
Site File – RAMS, COSHH, Inductions, Site Rules, training records
-
Esite set up including inductions, training records
Site Cabin / Compound / Storage
-
Hospital Details
-
First Aid Box, Eye wash & Burns kit
-
Fire Extinguisher(s)
-
Barriers / Demark compound
-
Smoking area / Mobile phone area
-
Waste Skip(s)
-
Storage containers
-
Drip trays / Plant Nappies & Spill kits
-
Storage Bunds / Gas Cage
Signage
-
Site signage as per Encyclopaedia
Task Specific Inspection Checklist
Site permits in place and operational
-
Confined Space
-
To Dig
-
Working at Height
-
Hot Works
-
Isolation Permit
-
Client Permit
Excavations
-
CAT & Genny scans completed
-
Soils away from excavation
-
Excavation battered back / stepped
-
Trench box / Shoring
-
Excavation daily inspection
-
Signage / Barriers
Task Specific Inspection Checklist
Scaffolding Fixed / Alloy Tower
-
Scaff tag / Inspect records / Handover
-
Toe boards in place
-
PASMA Stabilisers deployed
-
PASMA Wheels locked
Confined Space Entry
-
Permit to enter open, safety equipment operational
-
Harnesses tagged and in date
-
Stretcher and Rescue Plan
-
Tripod & Winch certification
-
Water Space Hygiene Equip
Plant & Work Equipment
-
Daily Inspections / Service Records
-
Plant Register inspections
-
LOLER & PUWER records
-
PAT Testing
-
HAVs Records / Vibrational Values
-
Life Vests / Throw lines
Lifting Operations
-
Lifting Plan
-
Signaller / Slinger Appointed / banks man
-
Lifting equipment certificated
Demolition
-
Demo Plan
-
Ensure stability of structure(s)
-
Disconnection of services Isolation
Completion
-
Site Inspection Signed Off By : (Name & Signature)