Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Documentation
-
Current versions of PMP is on site?
-
All employees and (sub)contractor personnel on site completed UKPN site Inductions?
-
Progress meetings carried out ?
-
Site safety inspections are occurring as schedule?
-
Daily Pre-starts meetings are occurring every day - Subcontractors are attending Pre-start meetings?
-
Do all items of plant have plant risk assessments available?
-
Safety issues raised at daily Pre-starts or toolbox meetings have been noted and addressed?
-
Toolbox for the site are occurring as schedule - subcontractors are attending addressed?
Safety - Environmental
-
Risk Assessments reviewed, signed and understood by those undertaking tasks?
-
All subcontractor works is undertaken under a site specific rams.
-
Is there any work in Confined Space?
-
Is there any Hot Work being performed? (Welding / spark emitting)
-
Work at Heights being performed?
-
Excavations /Trenching works being performed?
-
Underground / Overhead services clearly identified if present prior to work starting?
-
All plant operators on site licenced, competent and fit for work?
-
Emergency Assembly Areas been identified?
-
Are emergency contact numbers available to personnel on site? (ICE in contacts of phone)
-
Are there any special Environmental / Cultural Heritage considerations for this project?
-
Have site personnel been made aware of environmental restricted areas and controls?
-
Have appropriate material / waste / spoil stockpiles / disposal bins been identified, present & risk assessed?
-
Stocked First Aid kits & a minimum of 1 certified first aider on site? (ensure that the kit supplies within "used by date")
-
Fire extinguishers on site, well signed and been serviced in the last 6 months? (include plant extinguishers)
-
Hazardous substances and dangerous goods clearly identified (labels) and correctly stored?
-
Are spill kits required, available on site with instructions for use and operators trained in their use/application?
-
PPE review - all personnel including subcontractors wearing the minimum and appropriate PPE for the job?
-
Site supervisor adequate for project task? (include subcontractor supervision review)
-
Evidence of unreported incidents - environmental (spills, emissions, noise, impact on native vegetation or wildlife habitat), property damage or personnel injury?
Site and Facilities
-
Site layout effective & allow effective access & egress to site & work zones.
-
Site signage appropriate - visible, accurate?
-
Vehicle movement plan, including parking arrangements for plant / equipment, segregation of pedestrians effective?
-
Site facilities appropriate - fresh drinking water, toilets, shade, extreme weather protection?
-
Site cleanliness, is site being kept clean and tidy ?
-
Electrical equipment have been PA Tested (not expired)?
-
Extension leads, cables, fit for purpose
-
Potential or likely sources of ignition near flammable liquids or gas?
-
Site been assessed for potential or likely exposure to infectious substances (needle sticks)?
-
Has the fire danger rating been considered and appropriate controls put in place?
-
Other Observations?
Any Photographs Taken.
-
Add media
-
Signature of person inspecting
-
Signature of supervisor on site