Information
-
Site Inspection Title:
-
Report Serial Number:
-
Client:
-
Conducted On:
-
Report Prepared By:
-
Site Address:
-
Operatives On Site:
WORK IN PROGRESS
-
The following works are currently in progress:
PREVIOUS SITE INSPECTION
-
Has the Contractor received a previous site inspection?
-
Has the Supervisor / Foreman carried out a weekly site safety survey and completed a report?
TRAINING
-
Have all none compliances been rectified?
-
Does the Supervisor / Foreman hold SSSTS or another supervisory qualification?
-
Are tool box talks carried out, and if so what was the last to be delivered and by who?
-
Is evidence of trade training held on site for operatives?
CARE ABOUT APPEARANCE
-
Are work areas use by Sub-Contractor neat and tidy?
SECURITY
-
Does the Main Contractor prevent unauthorised persons entering site?
-
Does the site have a signing in book for operatives?
INDUCTION
-
Does the Main Contractor provide a site induction?
FIRE PLAN AND EMERGENCY PROCEDURES
-
Is there an Emergency Evacuation Plan in place and on display?
-
Is there a means of raising the alarm?
-
Is the muster point identified?
-
Are there adequate fire escape routes are they signed and kept clear?
-
Are appropriate and sufficient site fire extinguishers in available?
-
Do operatives have fire extinguishers to hand where hot works are being carried out?
ASBESTOS MANAGEMENT
-
Is there evidence that the site is free from asbestos materials, or that they are being appropriately managed?
RISK ASSESSMENTS
-
Has Sub-Contractor provided on-site risk assessments and are they current, suitable and sufficient?
-
Are they signed by a competent person?
METHOD STATEMENTS
-
Has Sub-Contractor provided an on-site method statement that is site specific, suitable and sufficient, and that is being complied with by the operatives it affects?
-
Are they communicated to operatives and countersigned as confirmation of being understood?
COSHH
-
Has Sub-Contractor provided a COSHH assessment for materials that present a COSHH risk?
NOISE AND VIBRATION
-
Has Sub-Contractor been provided with suitable and sufficient hearing protection where environmental conditions require it to be used?
SITE WELFARE FACILITIES
-
Are suitable welfare facilities available on site in line with CDM requirements?
FIRST AID PROVISION
-
Has a qualified first aider been identified for site?
PERSONAL PROTECTIVE EQUIPMENT
-
Has suitable PPE been provided for activities being carried out?
-
Is PPE in good condition?
-
Are all site personnel compliant with the site required PPE?
SAFE PLACE OF WORK
-
Are work activities being managed safely?
-
Can the working area be reached safely?
-
Is housekeeping in good order and the site free from trip hazards?
MANUAL HANDLING
-
Have manual handling assessments been carried out where required and being adhered to?
-
Are alternative mechanical means utilised?
LADDERS
-
Are ladders the right equipment for the job?
-
Are they in good condition?
PORTABLE PLANT AND MACHINERY
-
Is plant and equipment being used safely?
ELECTRICAL SAFETY
-
Is live work / inspection prohibited?
-
Is the supply a maximum of 110V?
-
Are cables and leads in good condition?
-
Are portable electrical appliances inspected and tested in accordance with the main contractors health and safety policy?
Report Summary
Report Summary
-
Site Inspector
-
Site Inspectors Comments
-
Site Manager / Representative
-
Supervisor / Foreman Comments
COMPLETION ON NON-COMPLIANCES
-
The Site Manager is confirm that the non-compliances raised have been appropriately dealt within the time frame specified by: 1. Signing and writing the date next to the non-compliance item. THE COMPLETED AUDIT IS TO BE RETURNED TO THE OFFICE FOR REVIEW AND ARCHIVE WITH PROJECT FILES