Information

  • Site Inspection Title:

  • Report Serial Number:

  • Client:

  • Conducted On:

  • Report Prepared By:

  • Site Address:
  • Operatives On Site:

WORK IN PROGRESS

  • The following works are currently in progress:

PREVIOUS SITE INSPECTION

  • Has the Contractor received a previous site inspection?

  • Have all none compliances been rectified?

  • Has the Supervisor / Foreman carried out a weekly site safety survey and completed a report?

TRAINING

  • Does the Supervisor / Foreman hold SSSTS or another supervisory qualification?

  • Are tool box talks carried out, and if so what was the last to be delivered and by who?

  • Are operatives CSCS cards checked (CCS)?

CARE ABOUT APPEARANCE (CCS)

  • Are first impressions of the work area being neat and tidy?

  • Is smoking managed for site?

SECURITY

  • Does the Main Contractor prevent unauthorised persons entering site?

  • Does the site have a signing in book for operatives?

PERFORMANCE BEYOND COMPLIANCE

  • Are there any examples of best practice and good health and safety management?

INDUCTION

  • Does the Main Contractor provide a site induction?

  • Does induction cater for non English speakers where applicable?

  • Does it cover adequate topics and are records retained?

FIRE PLAN AND EMERGENCY PROCEDURES

  • Is there an Emergency Evacuation Plan in place and on display?

  • Is there a means of raising the alarm?

  • Is the muster point identified?

  • Are there adequate fire escape routes are they signed and kept clear?

  • Are appropriate and sufficient site fire extinguishers in available?

  • Do operatives have fire extinguishers to hand where hot works are being carried out?

ASBESTOS MANAGEMENT

  • Is there evidence that the site is free from asbestos materials, or that they are being appropriately managed?

RISK ASSESSMENTS

  • Has Sub-Contractor provided on-site risk assessments and are they current, suitable and sufficient?

  • Are they signed by a competent person?

METHOD STATEMENTS

  • Has Sub-Contractor provided an on-site method statement that is site specific, suitable and sufficient, and that is being complied with by the operatives it affects?

  • Are they communicated to operatives and countersigned as confirmation of being understood?

COSHH

  • Has Sub-Contractor provided a COSHH assessment for materials that present a COSHH risk?

NOISE AND VIBRATION

  • Has Sub-Contractor been provided with suitable and sufficient hearing protection where environmental conditions require it to be used?

SITE WELFARE FACILITIES

  • Are suitable welfare facilities available on site in line with CDM requirements?

FIRST AID PROVISION

  • Has a qualified first aider been identified for site?

PERSONAL PROTECTIVE EQUIPMENT

  • Has suitable PPE been provided for activities being carried out?

  • Is PPE in good condition?

  • Are all site personnel compliant with the site required PPE?

SAFE PLACE OF WORK

  • Are work activities being managed safely?

  • Can the working area be reached safely?

  • Is housekeeping in good order and the site free from trip hazards?

MANUAL HANDLING

  • Have manual handling assessments been carried out and being adhered to?

  • Are alternative mechanical means utilised?

LADDERS

  • Are ladders the right equipment for the job?

  • Are they in good condition?

PORTABLE PLANT AND MACHINERY

  • Is plant and equipment being used safely?

TRAFFIC AND VEHICLES

  • Are there separate vehicle / pedestrian routes which are suitable and sufficient?

ELECTRICAL SAFETY

  • Is live work / inspection prohibited?

  • Is the supply a maximum of 110V?

  • Are cables and leads in good condition?

  • Are portable electrical appliances inspected and tested in accordance with the main contractors health and safety policy?

Report Summary

Report Summary

  • Site Inspector

  • Site Inspectors Comments

  • Site Manager / Representative

  • Supervisor / Foreman Comments

COMPLETION ON NON-COMPLIANCES

  • The Site Manager is confirm that the non-compliances raised have been appropriately dealt within the time frame specified by: 1. Signing and writing the date next to the non-compliance item. THE COMPLETED AUDIT IS TO BE RETURNED TO THE OFFICE FOR REVIEW AND ARCHIVE WITH PROJECT FILES

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.