Information

  • Site Inspection Title:

  • Report Serial Number:

  • Client:

  • Conducted On:

  • Report Prepared By:

  • Site Address:
  • Operatives On Site:

WORK IN PROGRESS

  • The following works are currently in progress:

PREVIOUS SITE INSPECTION

  • Has the Contractor received a previous site inspection?

  • Has the Supervisor / Foreman carried out a weekly site safety survey and completed a report?

TRAINING

  • Have all none compliances been rectified?

  • Does the Sub-Contractor Supervisor hold SSSTS or another supervisory qualification?

  • Are tool box talks carried out, and if so what was the last to be delivered and by who?

  • Is evidence of trade training held on site for operatives?

CARE ABOUT APPEARANCE

  • Are work areas use by Sub-Contractor neat and tidy?

SECURITY

  • Does the Principal Contractor prevent unauthorised persons entering site?

  • Does the site have a signing in book for operatives?

INDUCTION

  • Does the Principal Contractor provide a site induction?

FIRE PLAN AND EMERGENCY PROCEDURES

  • Is there an Emergency Evacuation Plan in place and on display?

  • Is there a means of raising the alarm?

  • Is the muster point identified?

  • Are there adequate fire escape routes are they signed and kept clear?

  • Are appropriate and sufficient site fire extinguishers in available?

  • Where Sub-Contractor activities involve hot works, is a fire extinguisher close at hand?

ASBESTOS MANAGEMENT

  • Is there evidence that the site is free from asbestos materials, or that they are being appropriately managed?

RISK ASSESSMENTS

  • Has Sub-Contractor provided on-site risk assessments and are they current, suitable and sufficient?

  • Are they signed by a competent person?

METHOD STATEMENTS

  • Has Sub-Contractor provided an on-site method statement that is site specific, suitable and sufficient, and that is being complied with by the operatives it affects?

  • Are they communicated to operatives and countersigned as confirmation of being understood?

COSHH

  • Has Sub-Contractor provided a COSHH assessment for materials that present a COSHH risk?

NOISE AND VIBRATION

  • Has Sub-Contractor been provided with suitable and sufficient hearing protection where environmental conditions require it to be used?

FIRST AID PROVISION

  • Has a qualified first aider been identified for site?

PERSONAL PROTECTIVE EQUIPMENT

  • Is appropriate PPE being worn by the Sub-Contractor in line with activity risk assessment?

  • Is PPE in good condition?

  • Is Sub-Contractor compliant with the PPE requirements of the Site Rules?

SITE WELFARE FACILITIES

  • Are suitable welfare facilities provided by the Principal Contractor in line with CDM requirements?

SAFE PLACE OF WORK

  • Are Sub-Contractor work activities being managed safely?

  • Can the working area be reached safely?

  • Is housekeeping in good order and the site free from trip hazards?

MANUAL HANDLING

  • Have manual handling assessments been carried out where required and being adhered to?

  • Are alternative mechanical means utilised?

WORK AT HEIGHT EQUIPMENT

  • Are ladders the right equipment for the job?

  • Are they in good condition?

  • Are podiums or access towers used?

  • Are they erected and inspected by a PASMA qualified person?

PORTABLE PLANT AND MACHINERY

  • Is plant and equipment being used safely?

  • Are guards fitted where required?

ELECTRICAL SAFETY

  • Is live work / inspection prohibited?

  • Is the supply a maximum of 110V?

  • Are cables and leads in good condition?

  • Are portable electrical appliances inspected and tested in accordance with the main contractors health and safety policy?

Report Summary

Report Summary

  • Site Inspector

  • Site Inspector Comments

  • Sub-Contractor Representative

  • Sub-Contractor Representative Comments

  • Principal Contractor Representative

  • Principal Contractor Representative Comments

COMPLETION ON NON-COMPLIANCES

  • The Site Manager is confirm that the non-compliances raised have been appropriately dealt within the time frame specified by: 1. Signing and writing the date next to the non-compliance item. THE COMPLETED AUDIT IS TO BE RETURNED TO THE OFFICE FOR REVIEW AND ARCHIVE WITH PROJECT FILES

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.