Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
DGSS0013 SITE SAFETY AUDIT SHEET Rev 8 - 02/12/2016
STANDARD INFORMATION
-
BRANCH MANAGER
-
CONTRACT MANAGER
-
SITE MANAGER / SUPERVISOR
-
SITE ADDRESS
-
CLIENT
-
JOBNUMBER
-
Dodd Group as Principal Contractor
-
Dodd Group as Sub-contractor
-
Direct employees
-
Agency/Sub-contractor staff employed by Dodd Group
-
Is there a separate Dodd Group site office or dedicated Dodd Group notice board
DOCUMENT AUDIT INFORMATION
-
Have operatives and visitors signed the daily Attendance Log DGP0062
1. Documentation & Awareness Information
1a. Construction Phase Plan Section
-
Is there an appropriate Construction Phase Plan ?
-
Are details of any amendments correctly recorded ?
-
Does the Plan correctly address the Project Description & Programme (section 1.1 of CPP) ?
-
Does the Plan effectively address site access and egress ?
-
Does the Plan identify hours of working ?
-
Does the Plan identify the timescales of the project ?
-
Does the Plan indicate if an HSE F10 notification is required ?
-
Is a copy of the relevant F10 available (if required) ?
-
Does the Plan correctly identify the relevant Duty Holders (section 1.2 of CPP) ?
-
Does the Plan correctly identify the Management and Site Management Structure ?
-
Are Temporary Works applicable to this site (section 2.3 of CPP) ?
-
Does the Plan effectively address Site Rules (section 2.4 of the CPP) ?
-
Does the Plan effectively address Arrangements to Ensure Co-operation Between the Project Team ?
-
Does the Plan effectively address Training Requirements (section 2.6 of CPP) ?
-
Does the Plan effectively address Site Inductions (section 2.7 of CPP) ?
-
Does the Plan effectively address welfare provisions for the site (section 2.8 of CPP) ?
-
Does the Plan effectively address Accidents and First Aid arrangements (section 2.9 of CPP) ?
-
Does the Plan name Emergency First Aid Trained Personnel (section 2.9 of CPP) ?
-
Does the Plan effectively address Fire, Emergency and Site Security Arrangements (section 2.10 of CPP) ?
-
Does the Plan provide details of the nearest Hospital with an A&E Department and details of how to get to it (section 2.10 of CPP) ?
-
Does the Plan effectively address Control Of Specific Site Risks? Ensure that only those that are applicable to the project are included. (Section 3 of CPP)
-
Does the Plan effectively address Safe Systems of Work (section 4 of CPP) ?
-
Does the Plan effectively address which Permit to Work are required on the project (section 4 of CPP) ?
1b. Project SHE File Section
Policy Documents
-
Is there a copy of the current Health & Safety Policy DGSS001 displayed or held within the file ?
-
Is there a copy of the current Quality Policy DGQMS0002 displayed or held within the file ?
-
Is there a copy of the current Environmental Policy DGES0002 displayed or held within the file ?
Section 1. Site Inductions
-
Does the Register of Subcontractors Form (DGSS124) list all subcontractors who are being utilised on site and their activity? Are the authorised & date columns being completed ?
-
Is there a Site Induction Record (DGSS015) for each operative (direct, agency and subcontractor) on site and is it filled out correctly (including CSCS card details) ?
-
Does the electronic Sub-Contract Induction Register & Training Record (DGSS104) list all operatives on site ?
-
Is there a record of Handheld Equipment & PPE for each operative (direct, agency and subcontractor) on site and is it filled out correctly and reviewed ?
Section 2. Training
-
Are there photocopies of all operatives CSCS cards (direct, agency and subcontractor)? Is the card number & expiry date recorded on the Site Induction Form (DGSS015) ?
-
Is there a Safety Awareness Talk Programme (DGP063) that is appropriate to the project and is it being adhered to ?
-
Are there copies of all Safety Awareness Talks (DGSS012) either in the Project SHE File or held separately ?
-
Is there a separate Attendance Record (DGQMS0113) for each Safety Awareness Talk given and have they been signed by the participating operatives ?
-
Are there photocopies of all relevant specialist training certificates for operatives on site (direct, agency and subcontractor), e.g. PASMA, IPAF etc. ?
-
Are there First Aid certificates for all EFAW qualified personnel on site ?
Section 3. Accident and Incident Reporting
-
Is there a copy of the current Accident & Incident Reporting Policy (DGSS021) ?
-
Is there an Accident Record Form (DGSS044) and are accidents being correctly logged onto it ?
-
Is there an Accident Book / Pack on site and readily available ?
Section 4. Near Miss Reporting
-
Is there a copy the current Near Miss Reporting Policy (DGSS022) ?
-
Are Near Miss Incidents being recorded on the Reporting Form DGSS020 ?
Section 5. Plant and Equipment
-
Is there a Planned Maintenance / Inspection Schedule (DGSS028) ?
-
Are there any Portable Appliance Test Records (DGSS051 or equivalent) ?
-
If required, are there copies of Mobile Tower Inspection Records (DGSS030) and Mobile Access Tower Inspection Checklist / Report (DGSS026) ?
-
If required, are there copies of Podium Inspection Records (DGSS084) ?
-
If required, are there copies of the Ladders, Stepladders & Hop-Ups Inspection Sheet for Construction Use (DGSS027A) ?
-
If required, are there copies of the Weekly MEWPS Inspection Records (DGSS078) ?
-
Is there a copy of the Hand Arm Vibration Safety Guide DGSS052 ?
-
If required, have Vibration and Noise Calculations been produced using the following:<br>HAV Daily Vibration Exposure Record DGSS076A and DGSS076B (instructions).<br>Hand Arm Vibration & Noise Assessment Tool (DGSS077) ?
-
If Harness & Lanyards are being used on site, have the following been completed:<br>Harness & Lanyard Register of Users (DGSS086) ?<br>Harness & Lanyard Inspection Sheet (DGSS085) ?<br>(Note: a copy of the users Work at Height Certificates must be included in section 2)
Section 6. Safe Systems of Work
-
Have suitable and sufficient Risk Assessments been produced for all work activities ?
-
Have appropriate COSHH Assessments been conducted ?
-
Is there evidence that risk assessments have been reviewed as necessary ?
-
Are Material Safety Data Sheets available for all substances used on site ?
-
Are all Method Statements correctly identified on the Register, DGSS119 ?
-
Is there evidence that these Method Statements have been reviewed (Using document DGSS067 or similar) ?
-
Are copies of Method Statements available for inspection ?
-
Are Method Statements suitable and relevant to the task ?
-
Have all personnel who are involved in the works relevant to a specific Method Statement acknowledged the safe system of work on form DGSS123 ?
-
Are Permits to Work correctly controlled and filed ?
Section 7. Temporary Works
-
Is there a copy of the current Temporary Works Procedure (DGSS034) held within the file ?
-
Is there a relevant Temporary Works Appointments form completed (DGSS162) ?
-
Where appropriate, are Temporary Works Design Briefs completed (DGSS165) ?
-
Where appropriate, is there a Record of Design Brief Check/Approval of Temporary Works (DGSS166) ?
-
Are there relevant Competency Assessments (DGSS164) ?
-
Is there a Register of Temporary Works and does it appear to be up to date (DGSS163) ?
-
Are Temporary Works Trackers completed for all applicable works (DGSS167) ?
-
Are Permits to Load/Use/Unload/Strike/Dismantle being used and are they being used correctly (DGSS168) ?
Additional Items
-
If required, is a copy the Companies Current Insurance Certificate available ?
-
Is there a current Health & Safety Law Poster prominently displayed ?
-
Is the Accident Reporting Flow Chart displayed in the site cabin or branch office ?
-
If applicable, have Dodd Group produced a Waste Management Plan ?
-
Is there a Site Plan identifying Site Wide Elements ?
-
Have actions arising from previous Paperwork Audit been completed ?
SITE INSPECTION
2. Welfare Facilities
-
Are toilet, urinal & washing facilities adequate for the number of persons on site ?
-
Is there an effective hot & cold running water supply ?
-
Is there a soap or hand wash dispensing station ?
-
Are there sufficient and adequate means for drying hands, face etc. i.e. towel or air dryer ?
-
Have adequate changing/drying areas been provided ?
-
Is there fresh drinking water available ?
-
Is there any means to boil water ?
-
Is there any means to heat a meal ?
-
Is the lighting & heating in the welfare area adequate ?
-
Are welfare areas kept clean & tidy ?
3 First Aid
-
Does the site have adequate first aid cover ?
-
Is there a first aid box suitable located ?
-
Is the First Aid Box adequately stocked and the contents in date ?
4 Plant & Equipment
-
Are all power tools 110 volt or below ?
-
Is all electrical equipment clearly marked with an in date PAT Label ?
-
Are all power tools in good condition and any safety devices operating correctly ?
-
Are cables, transformers & splitter boxes in good condition ?
-
Are machine / tool safety guards in good condition ?
-
Is it clear that the right plant & equipment is being used for the job ?
-
Is access equipment in good condition e.g. podiums, mobile towers, stepladders and ladders ?
-
Are all stepladders class 1 or EN 132 ?
-
Are operatives trained & competent to operate MEWPS, abrasive wheels etc. ?
-
Are visual & audible warnings on site plant working ?
-
Are MEWPS switched off and keys removed from ignition when left unattended ?
-
Are battery operated MEWPS charged in a well ventilated area ?
5. Personal Protective Equipment
-
Are all operatives wearing mandatory PPE ?
-
Are other items of PPE being used when required ?
-
Are all items of PPE in good condition ?
-
Are operatives wearing suitable clothing ?
6. Fire & Emergency
-
Is there a means of raising the alarm, and does it work ?
-
Are there adequate escape routes and are they kept clear ?
-
Are there adequate fire exit signs ?
-
Are adequately suitable fire extinguishers provided and are they accessible ?
-
Are suitable fire extinguishers accessible within the vicinity of Hot Works ?
-
Has annual servicing of extinguishers been maintained ?
-
Are fire extinguishers fully charged ?
-
Is the area clear of combustible materials where hot works are being conducted ?
-
Is the area clear of flammable substances where hot works are being conducted ?
-
Are flammable liquids and gases stored correctly ? e.g. LPG & Acetylene ?
7. Housekeeping & Environmental
-
Are scaffold platforms free from debris & materials ?
-
Is the site kept tidy ?
-
is the site free from trip hazards ?
-
Are materials stored safely ?
-
Is the site adequately lit in all areas ?
-
Have precautions been taken to prevent nuisance from dust ?
-
Is the area underneath and around cement silo's kept clean & tidy ?
-
Is there a bunded area around fuel bowsers ?
-
Have precautions been taken to prevent contamination of ground & water sources ?
-
Is waste segregated and disposed of in appropriate skips ?
8. Static & Mobile Tower Scaffolds
-
Are static scaffolds erected, altered & dismantled by competent persons ?
-
Are all uprights provided with base plates & where necessary timber sole plates ?
-
Are all uprights, ledgers, braces & struts in position and in good condition ?
-
Is the scaffold tied to the building or structure to prevent collapse ?
-
Are upper & mid guard rails fitted at every edge to prevent falls ?
-
Are adequate toe boards fitted at every edge ?
-
Are additional brick guards provided to prevent materials falling from scaffold ?
-
Is there safe access to the scaffold platform ? i.e. tied ladder extending 1m or 5 rungs above landing point ?
-
Are work platforms fully boarded & are boards arranged to avoid tipping or tripping ?
-
Are there effective barriers or warning notices in place to stop operatives using an incomplete scaffold ?
-
Is the Maximum Safe Working Load (SWL) displayed on scaffold loading bays ?
-
Are loading bays fitted with swing gates or other edge protection to prevent falls ?
-
Does a competent person inspect the scaffold at regular intervals ?
-
Are mobile tower scaffolds erected, altered and dismantled by competent persons ?
-
Do mobile tower scaffolds have scafftags or similar means to identify inspection ?
-
Are these inspections being carried out by a PASMA qualified person ?
-
Have mobile tower scaffolds been correctly erected ?
-
Are incomplete mobile tower scaffolds suitably identified to prevent use ?
9. Site Security & Public/Site Operative Safety
-
Is the site securely fenced from the public with hoarding or other suitable barriers ?
-
Are site safety notices prominently displayed ?
-
Is the site adequately protected from trespass ?
-
Is there a site speed limit? Is it enforced & being adhered to ?
-
Are pedestrian & vehicle routes segregated as far as reasonably practicable ?
-
Are holes barricaded and marked to prevent falls ?
-
Has robust fall protection been provided across dry riser openings ?
-
Has robust fall protection been provided across lift shaft openings ?
-
Are there adequate barriers or edge protection to stop operatives or materials falling from roofs ?
-
Are operatives & members of the public protected from falling material ?
-
Have hearing protection zones been marked ?
-
Are energised circuits, panels and other conductors properly guarded or secured ?
-
Are temporary 415 volt sub-main enclosures securely locked ?
-
Have operatives been informed of any potential Asbestos Hazards ?
10. Excavations
-
Is there adequate support for the excavation, or has it been sloped or battered back to a safe angle ?
-
Is there safe access into the excavation, e.g. sufficiently long, secured ladder ?
-
Are there barriers or other methods of protection to stop people & vehicles falling in ?
-
Is the excavation safe in relationship to the stability of neighbouring structures or services ?
-
Are materials, spoil and plant stored away from the edge of the excavation to reduce the risk of collapse ?
-
Is the excavation regularly inspected by a competent person ?
11. Safe Method of Working
-
Are Temporary Works carried out in a safe and proper manner ?
-
Are the wheels of mobile tower scaffolds & podiums locked when in use ?
-
Are the platforms of mobile tower scaffolds & podiums empty when they are moved ?
-
Are operatives accessing and egressing mobile tower scaffolds correctly ?
-
Are operatives closing the gate when working on podiums ?
-
Are MEWPS being operated safely ?
-
Has a suitable Permit to Work system been implemented ?
-
Is there a safety barrier around portable pipe threading machines ?
-
Have welding screens been erected where arc welding is being conducted ?
-
Are warning notices displayed when welding works are in process ?
-
Are operatives following Method Statements ?
Audit Observations
-
ADDITIONAL COMMENTS