Information
-
Business Name of Inductee or Employer.
-
Conducted on
-
Induction conducted by:
Inductee details
Inductee details
-
Inductee details
Inductee
-
Inductee Name
-
Insert Mobile No.
-
Insert DOB
-
Emergency Contact (first name)
-
Emergency contact no.
-
Known allergies?
-
Insert photograph of inductee
-
Photograph white card and trade licence (if applicable) of inductee
Induction
As a RYSE Construction worker/subcontractor I am aware and have been given the opportunity to raise any issues with the following points:
-
I am aware that I am to wear appropriate Personal Protective Equipment relative to the task I am performing and have been given training in its use
-
I have been advised who to contact if an incident occurs and I am aware of the contact numbers on the site sign.
-
All safety issues should be reported to a RYSE Construction Representative without delay
-
I am aware all rubbish is to be placed in designated areas or bins
-
All electrical equipment including need to be kept in current test and tag or not taken onto site.
-
I am aware only licensed scaffolders are to erect/dismantle scaffold over 2 meters and only licensed scaffolders may alter the scaffold.
-
If an area is barricaded off or isolated for any reason, I must avoid walking through or working in the area
-
Work areas are to be kept clean, tidy and accessible at all times
-
I must carry my general Induction card (White Card) at all times on site
-
I must not be affected by drugs or alcohol anytime whilst working on site
-
I will not engage in any activities that will bring RYSE Construction into disrepute
-
Smoking is only permitted outside homes where there is no risk of fire or damage to house, cigarette butts must be disposed of appropriately
-
No fighting or over aggressive behavior will be tolerated
-
I will be engaging in high risk activity as stated in Work Health & Safety Regulations 2011, if yes prior to conducting work I will submit a Safe Work Method Statement to RYSE Construction and I will have read, understood and signed SWMS
-
Work involving a risk of a person falling more than 2m
-
Any work connected with an excavation or demolition
-
Work involving structural alterations or repairs
-
Work is carried out in or near a confined space
-
Work in or near a pier or trench greater than 1.5m
-
Work is carried out on or near
-
I understand that if I fail to adhere to RYSE Construction policies and procedures as stated in the WHS management Plan, I will be required to pay costs for any non-conformance. The contents of the RYSE Construction WHS Management plan is part of the completed subcontractor engagement pack completed.
-
I certify that I have undergone RYSE Construction Subcontractor Induction Training and have been made aware of Site Rules, WHS management Plan and Code of conduct.
-
Induction completed by: