Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
WEATHER
-
SITE CONDITIONS
-
TRAFFIC MANAGEMENT
- yes as per TMPP
- no not as per TMP
- n/a to site
1.0 ACTIVITY : SEWER, WATER, DRAINAGE, ELECTRICAL, TELSTRA / NBN.
-
Sewer Sub Contractor Onsite
-
Water Sub Contractor Onsite
-
Drainage Sub Contractor Onsite
-
Electrical Sub Contractor Onsite
-
Telstra / NBN Sub Contractor Onsite
1.1 Works - Trenching, Pipelaying, Pits/Manholes, Backfill
-
Sewer Retic Staus
-
Drainage Works Status
-
Water Retic Status
-
Electrical Retic Status
-
Telstra / NBN Status
-
Is there an accredited pipe layer on site where required.
-
Are trench widths adequate for pipe size/ type
-
Is the bedding material & thickness within tolerance and being compacted correctly
-
Are pipes being installed in accordance with design specification and manufacturers recomendations.
-
Are clearances to other services being maintained as per specification.
-
Does trench backfill material comply with standard drawings and specifications
-
Is mechanical compaction being carried out to specification within the support zone and around MH, MS, IS, Hydrants,Valves and Stormwater Pits.
-
Has the concrete been placed and vibrated to specification
-
Is the surface finish of pit / manhole walls satisfactory.
-
Are lids / covers as per design and correct rating.
2.0. ACTIVITY : DEMOLITION, STRIPPING, BULK EARTHWORKS, ROAD BOXING, LOT GRADING, TOPSOILING
-
Demolition / Stripping status
-
Bulk Earthworks, Cut / Fill status
-
Road Boxing Status
-
Grading / Topsoiling Status
2.1 Works - Earthworks, Excavation
-
Are truck / scraper routes around site clearly designated and separate from public access areas.
-
Is fill being placed in layers and compacted as per specification.
-
Are compaction tests being conducted to specified Level by NATA registered tester.
2.2 Safety - Earthworks, Excavation
-
Does the contractor have utilities / services plans on site.
-
Does plant and equipment have suitable warning lights and reversing beepers
-
Are personnel in the vicinity of operating plant wearing high vis clothing and helmets where required.
2.3 Environmental - Earthworks, Excavation.
-
Is there provision to minimize dust / mud from leaving the site.
-
Do stockpiles have adequate silt runoff protection.
-
Are environmental No Go areas fenced where required.
-
Are silt traps in place to prevent silt build up in previously installed drainage system.
3.0. ACTIVITY : PAVEMENT
-
Subgrade excavation - visual check of line and level<br>Measurement by tape & string line of correct set out
-
Subgrade preparation - check compactiond using approved vehicle to proof roll the subgrade and string line to check level
-
AG drain installation - check for depth below subgrade and trench width by tape<br>Check backfill material (screenings)<br>No sock on 100mm AG
-
Service conduit installation - conduits to have min 250mm cover below pavement boxing - measurement by tape
-
SUBGADE HOLD POINT - subgrade layer must be approved prior to commencement of BASE LAYER
-
Base layer - Class 3 crushed rock <br>Check class 3 for compaction and level using approved vehicle to proof roll and string line (tolerance plus/minus 10mm)
-
BASE LAYER HOLD POINT<br>Base layer must be approved prior to commencement of sub base layer
-
Sub base layer - class 2 crushed rock<br>Check class 2 for compaction and level using approved vehicle to proof roll and string line for correct level (tolerance plus/minus 10mm)<br>Sub base can only commence after sufficient curing of adjoining k/c and backing up of nature strip to rear of kerb.
-
Trenches under pavement and kerb & channel back filled with class2 - visual inspection and measurement of correct depth
-
SUB BASE LAYER HOLD POINT<br>Sub base layer must be approved prior to commencement of asphalt layer
-
Asphalt Base Course<br>Application of asphalt to be during temperatures above 12 degrees C and dry
-
Wearing Course Asphalt Status<br>Application of asphalt to be during temperatures above 12 degrees C and dry
3.1 Works - Pavement
-
Does trench backfill material comply with standard drawings and specifications
-
Does pavement material comply with plans, standard drawings and specifications.
-
Is compaction equipment adequate to achieve specified results.
-
Is crushed rock being placed in layers and compacted as per specification.
-
Are compaction tests being conducted to specified Level by NATA registered tester.
-
Is the weather suitable for priming or placing asphalt.
Drainage
-
Pipe trench excavation - measure by tape
-
Depth of bedding & material for pipes - measure by tape<br>20mm class 3 for concrete pipe<br>7mm aggregate for UPVC pipe
-
Drainage pipe condition - visual inspection of pipes prior to laying for damaged joints or cracks
-
Drainage pipes at correct line & level - visual check to ensure pipes laid true to line & level
-
Pipe connections & haunching - visual inspection
-
Approved jointing method applied - visual inspection
-
Depth of backfill and cover for pipes and material - measurement by tape in accordance with design/standards.<br>20mm class 2 crushed rock for all trenches under traffic able areas
-
Pit construction - visual inspection of form work to ensure correct thickness of walls and floor 150mm
-
Inside of pits rendered - visual inspection of pit walls once formwork removed
-
Step irons - required for all pits greater than 900mm depth. 300mm centres at 500mm below top of pit
-
Pit covers - visual inspection to ensure pit frame and lids in accordance with standards
-
House drain connections - visual inspection to ensure each house lot is connected
4.0. CONCRETE
-
Kerb and Channel Status
-
Footpath and Crossover Status<br>
-
Pattern Paving Status
-
Endwall / Headwall Status
4.1 Works - Concrete
-
Are weather conditions suitable for placing concrete.
-
Kerb & Channel base preparation - measure by tape depth below top of kerb
-
Is boxing depth and crushed rock bedding as per specification
-
Grade of kerb & channel - check string line for correct alignment and level
-
Is kerb & channel type and profile correct
-
Kerb & channel line & finish - visual inspection for compliance to Council standards and acceptable finish
-
Pit lintels - visual check of correct line & height
-
Are kerb markings for services being installed.
Footpaths/Shared Paths
-
Path preparation - visual inspection of boxing for alignment<br>Measure width of path to Knox standards, grade and crossfall
-
Base for paths - measurement by tape
-
Pram crossings - visual inspection and measurement to standards
-
Reinforcement mesh - visual inspection min F72 & correctly placed
-
Footpath pour - correct expansion joint, spacing and finish
-
Tactile paving to DDA compliance - visual inspection to design/standards
Nature strips
-
Nature strip - visual inspection depth of topsoil 100mm
-
Topsoil levelled and flush with adjoining footpath
-
Nature strip seeded
5.0. ACTIVITY : ROCKWORK / MISCELLANEOUS
-
Rock Wall Status
-
Rock Endwall / Headwall Status
-
Rock Beaching Status
-
Porphrey Stone Paving Status
5.1 Works - Rockwork, Miscellaneous
-
Are rocks suitable for intended purpose and of appropriate size/ grading.
-
Are rocks sitting on concrete cushions over pipe ends
-
Are rocks being placed to specification and grouted as required.
-
Is reinforcing being installed as per specification.
COMMENTS / PROGRESS / INSTRUCTIONS.
-
PHOTOS