Information
-
Audit Title
-
Contractor / Site
-
Location
-
Conducted on
-
Prepared by:
-
Also present:
-
Insure Contractor has the correct version of the approved plans?
-
Have you received a copy of the Project Management Plan from the Contractor?
-
Have you received a copy of the Environmental Management Plan from the Contractor?
-
Have you received a copy of the Traffic Management Plan and MOA (if required) from the Contractor?
-
Have you received a copy of the Contractors OH&S Manual (including Site Specific SWMS)?
-
Has the Contractor had Cultural Heritage checks done on the purposed site? If not refer Contractor to Lloyd Hood (PH:0419 508 971) or DSE?
-
Supply Contractor with the required hold points and insure they understand the works cannot proceed until a Council Representative has inspected and approved the hold point.
-
Arrange on-site meetings.
-
Contractor to sign:
-
Council Representative to sign: