Title Page
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Select inspection period
After every 250 hours or fortnightly whichever earlier
-
Ensure optimum liquid level to avoid dry run wherever auto cut or in cut is not provided
-
Motor load current
-
Pump discharge pressure
-
Any abnormal sound and vibration of connected piping
After every 8000 hrs. or 2 years whichever earlier (for saline service, this interval may be reduced as required)
-
Complete overhauling of the pump shall be carried out. This shall include part-wise inspection – Part-Wise Inspection During Complete Overhaul of Centrifugal Pumps
Completion
-
Comments
-
Inspector Name and Signature