Substation
-
Date
-
Inspected by
-
Leaks (air, gas, and/or oil - include the equipment leaking, where, and severity)
-
Operation of breaker air compressor(s) checked (if applicable)
Nitrogen pressure
-
Press Add unit to input unit, tank pressure, and XFMR pressure
unit
-
Unit
-
Tank pressure
-
XFMR pressure
-
General overall primary equipment condition ( transformers, breakers, switches, PTs, CTs, insulators, etc.)
-
General overall yard condition (cable through, security problems, etc.)
-
Condition of capacitor banks (leaks, bulged cans, blown fuses, etc.)
-
If the capacitor cans are PCB and leaking, notify ESO immediately for corrective action by substation construction & maintenance
-
General overall control house condition (doors, windows, lighting, etc.)
-
Annunciator checks (list alarms in and test switches pulled, check for burned out bulbs)
-
Battery & charger checks (battery voltage, charging current, check electrolyte level & indicate problem cell)
-
DC ground lights checked
-
Eye wash station expiration date
-
Fire extinguisher condition
-
Fire extinguisher date
-
Fire extinguisher initial card
-
Overall Comments
-
Conduct a thermography inspection of substation (list hot spots here)