Title Page

  • Substation

  • Date

  • Inspected by

  • Leaks (air, gas, and/or oil - include the equipment leaking, where, and severity)

  • Operation of breaker air compressor(s) checked (if applicable)

Nitrogen pressure

  • Press Add unit to input unit, tank pressure, and XFMR pressure

  • unit
  • Unit

  • Tank pressure

  • XFMR pressure

  • General overall primary equipment condition ( transformers, breakers, switches, PTs, CTs, insulators, etc.)

  • General overall yard condition (cable through, security problems, etc.)

  • Condition of capacitor banks (leaks, bulged cans, blown fuses, etc.)

  • If the capacitor cans are PCB and leaking, notify ESO immediately for corrective action by substation construction & maintenance

  • General overall control house condition (doors, windows, lighting, etc.)

  • Annunciator checks (list alarms in and test switches pulled, check for burned out bulbs)

  • Battery & charger checks (battery voltage, charging current, check electrolyte level & indicate problem cell)

  • DC ground lights checked

  • Eye wash station expiration date

  • Fire extinguisher condition

  • Fire extinguisher date

  • Fire extinguisher initial card

  • Overall Comments

  • Conduct a thermography inspection of substation (list hot spots here)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.