Title Page

  • Substation

  • Date

  • Leaks (air, gas, and/or oil - include the equipment leaking, where, and severity)

  • Operation of breaker air compressor(s) checked (if applicable)

Nitrogen pressure

    unit
  • Unit

  • Tank pressure

  • XFMR pressure

  • General coverall primary equipment condition ( transformers, breakers, switches, PTs, CTs, insulators, etc.)

  • General overall yard condition (cable through, security problems, etc.)

  • General overall control house condition (doors, windows, lighting, etc.)

  • Condition of capacitor banks (leaks, bulged cans, blown fuses, etc.)

  • If the capacitor cans are PCB and leaking, notify ESO immediately for corrective action by substation construction & maintenance

  • Battery water level between the high and low lines (if not, identify the cell # and water level)

  • Fire extinguisher condition

  • Fire extinguisher date

  • Fire extinguisher initial card

  • DC grounds checked

  • All trash removed

  • Comments

  • Inspected by

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.