Title Page
-
Document No.1
-
SUBSTATION INSPECTION REPORT
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Buildings General Condition
Planned timeframe audit
-
Building lighting Ac and DC
-
Water supply and toilets
-
Building security - doors etc.
-
Radio operational
-
Yard condition - vegetation etc.
-
Log book up to date
-
Supply of CB operation sheets
Switch yard - general
-
Switch yard lights
-
Switch yard house keeping
-
Electric fence
-
Yard security
-
Equipment labels
-
Duct covers
-
Conductors and clamps
-
Bird proofing - nests and debris
-
Bus bars
-
Insulators
-
Steel work condition
-
Concrete poles condition
-
Earthing points
-
ABS's and disconnectors
-
Other
Standby batteries
-
Charge Reading
-
Discharge Reading
-
Top Up
-
Cyclo Meter
Circuit Breakers
-
Read and Reset MDI's
-
kWH reading
-
CB counter
-
Record and reset flags
-
Oil leaks?
-
Cubicles
-
Replace failed
-
Indicator lamps
-
CB noises
-
Visual check
-
Protection relays
-
Check operating tools
-
Other comments
Transformer 1
-
Conservator oil level
-
Temperture
-
Tap change cyclo
-
Oil leaks
-
Silica gel
-
Transformer noises
-
Porcelains
-
Explosion vents
-
Cubicle
-
Mounts - bolts etc.
-
Other comments
Transformer 2
-
Conservator oil level
-
Temperture
-
Tap change cyclo
-
Oil leaks
-
Silica Gel
-
Transformer noises
-
Porcelains
-
Explosion vents
-
Cubicles
-
Mounts - Bolts etc.
-
Other comments
kWH meter reading
-
Meter number and reading
-
Meter number and reading
Sign off by auditor
-
Add signature