Form Nr
-
City Wharf
-
Conducted on
-
Prepared by
-
Form Location
-
Are the correct revision of drawings being used? Add picture for demonstration
Untitled Page
-
1. Check Setting out and level.
-
2. Is the blockwork/brickwork located correctly on the foundation.
-
3. Have the correct materials been used.
-
4. Are the services and drainage entry points correct.
-
5. Have the doorway/openings at dpc level been allowed for.
-
6. Does the face brickwork extend beyond proposed ground level.
-
7. Has the drainage been inspected
-
Signature of Sub Contractor.
-
Signature of Site Manager
-
Signature of Compliance Manager