Information

  • Month/Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Elevation assessed & works completed.

  • Location
  • Personnel

Acceptance criteria/ Rules of Proper Workmanship 1. No work to be performed unless environmental conditions are as specified in therms of temperature, humidity and wind exposure. 2. Mixing time and proportions must be correct as per specification. 3. Safe systems of work must be enforced for working at height.

  • BEFORE YOU START THIS REPORT, REFERENCE MUST BE MADE TO THE PROJECT ELEVATION LAYOUT SKETCH DETAILING THE EXACT LOCATION(S) INSPECTED.

    Rules of WIR and Progress Reporting:

    1. All reports need to be in for the dates that have been agreed on the Reporting Schedule. PM must contact HSEQ Department if there will be a delay.
    2. The elevation inspected must be clearly identified using the Elevation Layout Sketch produced by the CM of the project, clearly identifying each elevation and floor. Ideally, there should be a separate Report for each elevation, however on smaller works, a single report for more than one elevation is acceptable.
    3. Each report should include a description of the type of system / works undertaken.
    4. Reports should also include quality issues not caused by CF, but which impact on our works.
    5. Refer to recent Supplementary Quality Reports before starting.
    6. We have issued standard Detail drawings reference numbers D01, D02, and so on. These need to be referred to throughout WIR and clearly show what is required. Only “Clarke” Drawings should be followed.
    7. All reports must be up-loaded to Clarkes Server or emailed to HSEQ Dept before deadline.The next report that will follow must show how the errors were rectified. If improvement was not possible, e.g.: due to soft ground/lack of access, it needs to be described/explained. The answers column still needs to be highlighted red. However, if the error was rectified the section should be changed to green. The comment section is to be used for explanations of how and when error was rectified.
    8. If project manager has found an error during the assessment, it must be noted and fixed before consecutive stages of works progresses, eg: CP board cannot start before Metsec sub frame is properly fixed. Quality Control Manager cannot accept the next WIR report until everything is fixed and up to date on the previous report. This is to make sure that all errors are corrected, and there are no error omissions.
    9. Reports need to be genuine and relevant.
    10. It is important that reports always have any delay events recorded.
    11. All completed reports must be sent to head office, client and subcontractor.

  • Elevation assessed & works completed.

  • Completed by Subcontractors:

  • Add media

A. Pre-start checks.

  • 1. Are conditions, access safe?<br>

  • Add media

  • 2. Are materials properly stored?

  • Add media

  • 3. Is substrate dry , clean and free from defects.?

  • Signed of by Project Manager.

Breather membrane.

  • 1. Have all vents, brackets, rainwater pipes or electric cables been taken through the breather membrane and properly sealed with Dafa tape ?<br>

  • Add media

  • 2. Has the correct and specified breather membrane been installed?<br>

  • Add media

  • 3. Has the breather membrane been dressed out and over horizontal flashings / pods and taped and sealed?<br>

  • Add media

  • 4. Has breather membrane been installed as per manufacturer recommendations and drawings with min. bottom overlap of 100mm and min. 150mm vertical overlap. Has it been taped at vertical joints and at horizontal joints?<br>

  • Add media

  • 5. Has the breather membrane been taped to and around all openings protrusions, as specified on the Reference Drawing D 03 (see MClarke reference booklet)<br>

  • Add media

  • 6. Have all parts of EPDM properly overlapped and secured with Dafa tape?<br>

  • Add media

  • 7. Has Spray bar test been done ? (Note: To be carried out after breather membrane is installed, and before internal plaster board is installed - 5% of cladded areas and two areas have to be tested as minimum. It must be done in accordance with specification requirements and CWCT.)<br>

  • Add media

Timber battens.

  • 1. Were timber battens stored properly?<br>

  • Add media

  • 2. Are timber battens as per specification ?. Are timber battens of proper size so as to allow fixings spaced 30mm from the edge of the board?<br>

  • Add media

  • 3. Have timber battens beet installed at correct centres, using correct fixings?<br>

  • Add media

  • 4. Have timber battens been adjusted to correct line and level?<br>

  • Add media

  • 5. Are additional support battens required around openings/reveals?<br>

  • Add media

  • 6. Have margins around openings been installed consistently (gauge should be used)?<br>

  • Add media

  • 7. Has insect mesh been installed correctly?<br>

  • Add media

  • 8. Has correct horizontal and vertical movement gap been left between the battens?<br>

  • Add media

Y-Wall Board fixed to timber battens.

  • 1. Are sheeting boards fitted to the frame at specified centres? Have correct/specified fixings been used? (minimum 25 fixings per board)<br>

  • Add media

  • 2. Have screws been fixed correctly into boards (not over tight - Draw.Ref.D0 2.1, using Nose Piece (Draw. Ref:D02, Clarke Facades Reference Booklet)<br>

  • Add media

  • 3. Are cement board joints tightly abutted, with exceptions of movement joints?<br>

  • Add media

  • 4. Are cement board joints staggered?<br>

  • Add media

  • 5. Has the sheeting board been installed with no bumps, gaps, and bows?<br>

  • Add media

  • 6. Has Dafa tape been applied to all boards<br>

  • Add media

  • 7. Have movement gaps been sealed as per detailed drawings/specification requirement?<br>

  • Add media

  • 8. Is insect mesh properly joined with render boards?<br>

  • Add media

Primary layer of insulation.

  • 1. Has insulation been fixed into y-wall board with recommended number of fixings?<br>

  • Add media

  • 2. Have stainless steel fixings been used?<br>

  • Add media

  • 3. Has insulation been fitted consistently without gaps ?<br>

  • Add media

  • 4. Have fire barriers been fitted in the specified locations?<br>

Preparation for Gebrick panel system installation.

  • 1. Have the operatives been provided with sufficient training in the specified system?<br><br><br>

  • Add media

  • 2. Have movement joints been maintained in the designed locations?<br>

  • Add media

  • 3. Have the operatives been given relevant drawings and details to complete the works?<br>

  • Add media

  • 4. Are EPDM's correctly installed?<br>

  • Add media

  • 5. Is the wall substrate CP board surface)to correct line and level? (This is of great importance as it would not be possible to make any adjustments to levels during further stages of works i.e application of Gebrik panels.)<br><br><br>

  • Add media

  • 6. Are sills, pods and flashings installed to the correct design details? Thickness, colour and depth?<br>

  • Add media

  • 7. Are cills, pods and flashings installed to suit correct location?<br><br><br>

  • Add media

  • 8. Have all vents, brackets, rainwater pipes been taken through the CP board and handed over to the main contractor?<br>

  • Add media

  • 9. Has EPDM been installed to all vents, rain water pipes, louvre bracket fixing centres?<br>

  • Add media

  • 10. Has the correct and specified breather membrane been installed?<br>

  • Add media

  • 11. Has the breather membrane been dressed out and over horizontal flashings, pods and taped and sealed?<br>

  • Add media

  • 12. Has the breather membrane been taped to and around all openings protrusions, as specified on the Reference Drawing D 03 of "MClarke reference booklet"?<br><br>

  • Add media

Starter Rail and Securing Components

  • 1. Have Gebrick panels been checked for straightness?<br><br>

  • Add media

  • 2. Have weep holes been integrated within the system.? (should be installed at the bottom of the system and additionally where specified on detailed drawings/specification)<br><br><br><br>

  • Add media

  • 3. Has the rail been set out in accordance with the datum prior to application of Gebrick panels.?<br><br>

  • Add media

  • 4. Has the first insulation board (120mm), been fixed into the CP Board with at least of 4 fixings and one stainless steel fixing?<br><br><br>

  • Add media

  • 5. Has a bead of PU foam been injected along the top edge of the secured rail to prevent water ingress up and behind the system.?<br><br>

  • Add media

  • 6. Has a bead of PU foam been injected along the internal corner of the secured rail to prevent water ingress between the system and the rail.?<br><br>

  • Add media

  • 7. Has 5mm joint been removed from the first course of panels so the brick edges sits on the rail?<br><br>

  • Add media

  • 8. Has foam been notched at the back of the first course to the depth of the rail to avoid a "bell" effect at the base?<br><br>

  • Add media

  • 9. Has basetrack been fitted with appropriate fixings at 600mm centres?<br><br>

  • Add media

  • 10. Has base track been set out in proper line and level?<br><br>

  • Add media

  • 11. Has the Gebrik Corner Piece been installed as a first element, which while combined with properly set starter rail sets a right angle for installation of the first row of panels?<br><br>

  • Add media

  • 12. Have panels been drilled through in prelocated fixings locations?<br><br>

  • Add media

Sealing of the Gebrick system.

  • 1. Were chambers fully filled at every vertical and horizontal abutment? (foam should expand out of the pre-located openings across the top of the panels)<br><br><br>

  • Add media

  • 2. Are panels and corners flat.? (fixings to be tightened if necessary) <br><br>

  • Add media

  • 3. Has brick face been cleaned from any remains of PU?<br><br>

  • Add media

  • 4. Have fixings been fitted properly, not over tightened/under tightened ?. (If cracks are visible additional fixing must be used.)<br><br>

  • Add media

  • 5. Has the first panel been positioned on the starter rail, tightly abutting the corner element panel?<br><br>

  • Add media

  • 6. Have panels been fixed into substrate with correct length and correct number of fixing as per specification?<br><br><br><br><br><br><br>I. Panels that are less than 10m over the ground level need to be fixed with 9no of fixings.<br>II. Panels that are between 10-18 meters over the ground level to be fixed with 12no of fixings.<br>III. Panels that are 18meters over the ground level to be fixed with 16 no of fixings.<br>

  • Add media

  • 7. Has specified/recommended PU Foam been injected to an abutment chamber using a system designed pistol applicator?<br><br>

  • Add media

  • 8. Have specified/recommended PU cutters and plugs been used, so as to make sure that facade is watertight?<br><br>

  • Add media

  • 9. Have abutments of the elements been stitched together with matching single brick slip glued into the location with specified adhesive, so stretcher bond pattern of bricks was achieved ?<br>

  • Add media

  • 10. Has adhesive been applied onto the whole surface of the brick slip?, was adhesive mixed with the proper amount of water?<br><br><br>

  • Add media

  • 11. Have perp joints been aligned as traditional brickwork ? (typically should be positioned half way between the brick immediately above and below) <br><br>

  • Add media

  • 12. Have all locations of fixings and abutments of the elements been pointed with recommended mortar, in order to maintain traditional brick appearance?<br><br>

  • Add media

  • 13. Have specified compressible sealant and additional flexible sealant been used at points where panels join Cills and frames of the openings?<br><br>

  • Add media

Brick slip application. Using cement based adhesive.

  • 1. Was appropriate mix of cement based adhesive and water used ?(typically 9.25 l to 25 kg dry mix pro rata)<br><br>

  • Add media

  • 2. While mixing, was consistence of mixed adhesive smooth, left for few minutes and mixed again?<br><br>

  • Add media

  • 3. Was maximum allowed time for working with mixed adhesive obeyed? (approx. 3 hours, water can not be added once it is mixed)<br><br>

  • Add media

  • 4. Was proper amount of adhesive used ?( too much adhesive should not be used as the slips will sit proud of the panels and cast shadow in different angles of sunlight.<br><br>

  • Add media

  • 5. Are applied slip flat with adjoining Gebrick panels and corners.<br><br>

  • Add media

  • 6. Is brick face free from excess of adhesive.?<br><br>

  • Add media

Pointing

  • 1. Has mortar been batched?<br><br>

  • Add media

  • 2. Has the mortar been protected from subsequent inclement weather and direct sunlight until cured to avoid efflorescence and cracking?<br><br>

  • Add media

  • 3. Are joints fully filled so as to avoid lime staining?<br><br>

  • Add media

  • 4. Is brick face free from mortar staining?<br><br>

  • Add media

Inspection Results:

  • Add media

  • Signed off by the project manager.

  • Signed off by the main contractor representative.

E. Insulated render

  • 1. Has the applicator been given all detail drawings, levels, locations of fire breaks and location of expansion beads.?<br>

  • Add media

  • 2. Has the applicator got information of what way the adhesive is applied to boards (dabs, grated trowel or picture frame)?<br>

  • Add media

  • 3. Has the applicator been given manufacturer specification with regard to the pattern of mechanical fixings?<br>

  • Add media

  • 4. Have all down pipes, vents, grounds, brackets, Cills and cappings etc. been installed on the wall and properly sealed?<br>

  • Add media

  • 5. Are permanent cappings on, if not in place, are there temporary cappings on?<br>

  • Add media

  • 6. Has the wall been checked for straightness before mesh applied?<br>

  • Add media

  • 7. Have all door frames and window frames been over lapped by insulation at minimum of 10mm in order to ensure a good sealing?<br>

  • Add media

  • 8. Are down pipes on.?<br>

  • Add media

  • 9. Has mesh been overlapped properly at mesh joints.?<br>

  • Add media

  • 10. Have additional mesh reinforcement been added to four corners of the openings?<br>

  • Add media

  • 11. Were insulation boards additionally fixed to the substrate with proper number of mechanical fixings( as per design/manufacturer specification)?<br>

  • Add media

  • 12. Have two numbers of base coat been applied and sponged?<br>

  • Add media

  • 13. Has all protection been done.?<br>

  • Add media

  • 14. Has base coat been made of at least 6mm deep over the whole façade? (This must be strictly enforced)<br><br><br>

  • Add media

  • 15. Have fire barrier locations been additionally pinned through the mesh coat with stainless steel pin and stainless steel 40mm washer.?<br><br>

  • Add media

  • 16. Was a 100 mm mesh path applied over the pin location?<br><br>

  • Add media

F. Final coat.

  • 17. Was specified primer applied to the surface of the reveals and walls?<br>

  • Add media

  • 18. Have colours of the final coat been confirmed ? Were drawings checked so as to make sure that proper colour of final coat has been applied?<br><br>

  • Add media

  • 19. Was final coat applied during suitable weather condition as specified by the manufacturer.?<br>

  • Add media

  • 20. Is the texture and colour of render consistent?<br>

  • Add media

  • 21. Were curing conditions maintained?<br>

  • Add media

Preparation for rain screen cladding.

  • 1. Have the Operatives been provided with sufficient training in the specified system?<br>

  • Add media

  • 2. Has the operative been given the relevant drawings and details to complete the works?<br>

  • Add media

  • 3. Have the windows / curtain wall / doors been installed to correct levels and handed over to main contractor?<br>

  • Add media

  • 4. Are EPDM's correctly installed?<br>

  • Add media

  • 5. Is the wall substructure to correct line and level?<br>

  • Add media

  • 6. Are flashings installed properly to allow drainage of water from mullions?<br>

  • Add media

Breather membrane

  • 1. Have all vents, brackets, rainwater pipes or electric cables been taken through the breather membrane and properly sealed with Dafa tape?<br><br>

  • Add media

  • 2. Has EPDM been installed to all vents, rwp's/louvre bracket fixing centres?<br>

  • Add media

  • 3. Has the correct and specified breather membrane been installed?<br>

  • Add media

  • 4. Has the breather membrane been dressed out and over horizontal flashings / pods and taped and sealed?<br>

  • Add media

  • 5. Has breather membrane been installed as per manufacturer recommendations and drawings with min. bottom overlap of 100mm and min. 150mm vertical overlap. Has it been taped at vertical joints and at horizontal joints?<br>

  • Add media

  • 6. Has the breather membrane been taped to and around all openings protrusions, as specified on the Reference Drawing D 03 (see MClarke reference booklet)<br>

  • Add media

  • 7. Have all accidental tears, drill holes, cuts in the Breather Membrane been properly repaired?<br>

  • Add media

  • 8. Has breather membrane properly overlapped EPDM and been secured with Dafa tape?<br><br>

  • Add media

  • 8. Has Spray bar test been done ? (Note: To be carried out after breather membrane is installed, and before cladding and internal plaster board is installed - 5% of cladded area and two areas as minimum. It must be done in accordance with specification requirements and CWCT.)<br>

  • Add media

Subframe brackets.

  • 1. Have subframe brackets been installed in accordance with the subframe layout drawings?<br>

  • Add media

  • 2. Have correct type and number of fixings been used on brackets?<br>

  • Add media

  • 3. Have thermal pads been installed behind brackets?<br>

  • Add media

  • 4. Have brackets been fitted in the stud location?<br>

  • Add media

  • 5. Have bracket fixings been torqued correctly using correct torque drill?<br>

  • Add media

  • 6. Has a gap of 10mm been maintained between each length of cassette profile(vertical rail) to allow expansion between profiles?<br>

  • Add media

  • 7. Have rails been set out in accordance with deflection point location?<br>

  • Add media

  • 8. Have vertical rails been fitted with anti-rattle compression gaskets, has anti rattle sealing has been used?<br>

  • Add media

  • 9. Have horizontal hangers for the cassette panels been secured in position with two self-drilling self-tapping screws?<br>

  • Add media

  • 10. Have the setting of the profiles been checked for line and level?<br>

  • Add media

  • 11. Is there minimum one bracket per rail (should be the centre/middle one) provided with two fixings going through the round holes (fixed points)?<br>

  • Add media

Insulation & Taping

  • 1. Have fire barriers been fitted and at correct locations?<br>

  • Add media

  • 2. Have fire breaks been mitered at the edges of the facade so as to provide continuity of intumescent layer, have the edges of insulation boards been sealed with silver tape?<br>

  • Add media

  • 3. Has proper pattern of mechanical fixing been used ?.(Reference, see Figure 7, M.Clarke Guidance Booklet.)<br>

  • Add media

  • 4. Have fire pins been installed minimum one per board?<br>

  • Add media

  • 5. Has insulation been fitted as tight as possible?<br>

  • Add media

  • 6. Have all outlets, brackets, vents, edges of insulation boards, joints etc. been taped up with silver tape?<br>

  • Add media

  • 1. Has insect mesh/slotted angle been fitted at base, or in other location as specified on the detailed drawings?<br>

  • Add media

  • 2. Are cassette hangers aligned with the fabricated 'hook' cut out slots in the back of the panel?<br>

  • Add media

  • 3. Where Panel Hangers/hooks have been trimmed down, is there at least a 10mm lug left to carry the panel ?<br>

  • Add media

  • 4. Have horizontal datum lines been projected across the elevation, have positions of the hangers been marked on both flanges of each Vertical Cassette Profile.?<br>

  • Add media

  • 5. Has the first screw used been fixed through the slot and second screw fixed through the hole to lock the hanger in position?<br>

  • Add media

  • 6. Has fire break been maintained away at correct distance from the cassette panel(as per specification/drawings)?<br>

  • Add media

  • 7. Have cassette panels been lowered evenly, and all hook cuts have been engaged?<br>

  • Add media

  • 8. Have rivet/screw holes been fixed in the top corners, has panel been secured properly in its final position?<br>

  • Add media

  • 9. Have two number of security fixings been used?<br>

  • Add media

  • 10. Is protective film on panels being removed as soon as they have been installed to prevent leaving glue residue ?<br>

  • Add media

  • 11. Has distance between cassette panels been checked with wooden gap sticks, is it consistent?<br>

  • Add media

  • 12. Does the smaller panel align correctly with the larger panel below / is it flush ?<br>

  • Add media

  • 13. Is panel fit to underside of cill as tight as possible and realigned every 6 metres ?<br>

  • Add media

  • 14. Are there any visible exposed metal on folds/ corners or joints in Rain screen panels?<br>

  • Add media

Inspection results:

  • Add media

  • Signed off by the project manager?

  • Signed off by the main contractor representative:

F. Post installation checks.

  • 22. Were elements adjoined to render including: trims, sills, construction joints, opening frames, soffits, cappings etc. secured from dirt of adhesive, paints and top coat?<br>

  • Add media

  • 23. Has plant used. E.g. Cherry Pickers, scissor lifts been cleaned? Is plant ready for off hiring ? Have containers and tool boxes been emptied and checked for damages before making request of off-hire?<br>

  • Add media

  • 24. Has adequate protection been used?<br>

  • Add media

  • 25. Are electric boxes and other elements incorporated into facade cleaned out?<br>

  • Add media

  • 26. Has work area been left clean on completion?<br>

  • Add media

Inspection results.

  • signed by main contractor representative.

  • signed by project/contract manager.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.