Information

  • Month/Document No.

  • Audit Title

  • Client / Site

  • Elevation assessed & works completed.

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Rules of WIR and Progress Reporting
    1. All reports need to be in for the dates that have been agreed on the reporting timetable. If there are any reports missing the reporting manager (AS) needs to make contact with the contracts manager (JHL), finding out why reports are missing and getting confirmation when they will be in. Everybody needs to remember that there is a maximum of three working days over date of when the report needs to be in. It is not an option for reports not be done after three days.
    2. Generally, there should be reports prepared for each elevation, where all assessed levels are listed. Each single report may include more than one elevation. However, it must be clearly described in the introduction which facades have been examined and what works have been completed during the assessment.
    3. When job is being handed over to the project manager/contracts manager, the Reporting manager must prepare a construction plan drawing of the project, number each elevation and then refer to these numbers when conducting Work Inspections.
    4. Construction plan layout drawings with numbered elevations must be saved onto the M Clarkes reporting folder on the Network. Jobs/Projects/Quality.
    5. Each report should include in the introduction (cover page of report) description of the assessed façade (assigned number) along with the description of type of works which were completed as assessed façade (assigned number) along with description of type of works which were completed and assessed by project manager.
    6. We have issued standard detail drawings reference numbers D01, D02, D03, D04, D05 and so on. These are available in "M Clarkes Guidance Booklet” and need to be referred to throughout WIR and clearly show what is required.
    7. The report with error/failure marked RED, must be saved on the system. The next report that will follow must show how the error was rectified. If improvement was not possible, e.g. due to soft ground/lack of access, it needs to be described/explained. The answers column still needs to be highlighted red. However, if the error was rectified the section should be changed to green. The comment section is to be used for explanations of how and when error was rectified.
    8. If project manager has found an error during the assessment, it must be noted and fixed before consecutive stages of works progresses, eg: CP board cannot start before Metsec sub frame is properly fixed. Quality Control Manager cannot accept the next WIR report until everything is fixed and up to date on the previous report. This is to make sure that all errors are corrected, and there are no error omissions.
    9. Progress reports need to be genuine and relevant.
    10. It is important that progress reports always have delay events.
    11. All reports have to be sent to main contractor and subcontractor

  • Elevation assessed & works completed.

  • Completed by Subcontractors:

Acceptance criteria/ Rules of Proper Workmanship 1. No work to be performed unless environmental conditions are as specified in therms of temperature, humidity and wind exposure. 2. Mixing time and proportions must be correct as per specification. 3. Safe systems of work must be enforced for working at height.

A. Pre-start checks.

  • 1. Are conditions, access safe?<br>

  • Add media

  • 2. Are materials properly stored?

  • Add media

  • 3. Is substrate dry , clean and free from defects.?

  • Add media

B. SFS frame.

  • 4. Have SFS been given status and passed by the architects?

  • Add media

  • 5. Have the operatives been given the relevant drawings and details to complete the works?

  • Add media

  • 6. Is the wall constructed using the correct depth and gauge of studs/tracks?

  • Add media

  • 7. Are operatives using the correct track fixings?, are the tracks fixed/installed to concrete at correct centres?

  • Add media

  • 8. Are the operatives using the correct 'tek' screws for installing studs?

  • Add media

  • 9. Has the wall been set out to the correct Gridline offset?, and in correct location?

  • Add media

  • 10. Have the studs been installed to suit cladding joints location?

  • Add media

  • 11. Have the compound sills and lintels been fixed together at centres of no more than 300 mm?

  • Add media

  • 12. Have the openings been formed in the correct location ? Height, length and width?

  • Add media

  • 13. Are the openings being formed using correct studs/track compounds as per approved design specification?

  • Add media

  • 14. Have deflection heads been installed correctly with required movement allowance?

  • Add media

  • 15. Have the works been completed to the current outline specification and manufacturers specification ?( including windows and door openings)

  • Add media

  • 16. Have works been completed to current revised SFS drawings and details?

  • Add media

  • 17. Have VB bracing been installed as required?

  • Add media

  • 18. Is the wall completed to a true line and level?

  • Add media

Inspection results:

  • Add media

  • Signed off by Project Manager:

  • Signed off by Main Contractor representative.

C. Cement Board

  • 19. Have CP Board of correct/specified type and thickness been installed?

  • Add media

  • 20. Are boards installed in a stretcher bond fashion?

  • Add media

  • 21. Are there 3mm movement voids left around all edges of CP Boards?<br>

  • Add media

  • 22. Has there been 15 mm gap left for floor deflection joints?(Drawing reference: D01, see MClarke reference booklet).

  • Add media

  • 23. Have screws been fixed correctly into boards (not over tight- Draw. ref: D02.1), using Nose Piece(Draw. ref: D02, Clarke Facade Reference Booklet)

  • Add media

  • 24. Have correct number of fixing (minimum 25) been used?

  • Add media

  • 25. Has the CP board been installed with no bumps, gaps and bows?

  • Add media

  • 26. Was Daffer tape applied to all CP Board joints?

  • Add media

  • 27. Has the EPDM been installed to deflection joints and concrete interfaces?

  • Add media

  • 28. Is CP board fixed correctly at deflection track from floor to floor? Fixed to Track and not studs?

  • Add media

Inspection Results:

  • Add media

  • Signed off by Project Manager?

  • Signed off by main contractor representative.

D. Preparation for Gebrick panel system installation.

  • 30. Have the operatives been provided with sufficient training in the specified system?

  • Add media

  • 31. Have the operatives been given relevant drawings and details to complete the works?

  • Add media

  • 32. Are EPDM's correctly installed?

  • Add media

  • 33. Is the wall substrate (CP board surface)to correct line and level? <br><br>This is of great importance as it would not be possible to make any adjustments to levels during further stages of works i.e application of Gebrik panels.

  • Add media

  • 34. Are sills, pods and flashings installed to the correct design details? Thickness colour and depth?

  • Add media

  • 35. Are cills, pods and flashings installed to suit correct location?

  • Add media

  • 36. Have all vents, brackets, rainwater pipes been taken through the CP board and handed over to the main contractor?

  • Add media

  • 37. Has EPDM been installed to all vents, rain water pipes, louvre bracket fixing centres?

  • Add media

  • 38. Has the correct and specified breather membrane been installed?

  • Add media

  • 39. Has the breather membrane been dressed out and over horizontal flashings, pods and taped and sealed?

  • Add media

  • 40. Has breather membrane been taped at vertical joints and overlapped by 300mm at horizontal joints?

  • Add media

  • 41. Has the breather membrane been taped to and around all openings protrusions, as specified on the Reference Drawing D 03 of "MClarke reference booklet"?

  • Add media

Inspection Results:

  • Signed off by the Project Manager

  • Signed off by the main contractor representative.

E. Base track and Gebrik panel system.

  • 42. Has basetrack been fitted with appropriate fixings at 600mm centres?

  • Add media

  • 43. Has base track been spaced out using Starter track connectors?

  • Add media

  • 44. Has base track been set out in proper line and level?

  • Add media

  • 44.1 Has the first insulation board (50mm/60mm), been fixed into the CP Board with at least of 4 fixings and one stainless steel fixing?<br><br>

  • Add media

  • 45. Has the Gebrik Corner Piece been installed as a first element, which while combined with properly set starter rail sets a right angle for installation of the first row of panels?<br>(Reference: MClarke Gebrick installation Guide)

  • Add media

  • 46. Have panels been drilled through in prelocated fixings locations?

  • Add media

  • 47. Has the first panel been positioned on the starter rail, and tightly abutting the corner element panel?

  • Add media

  • 48. Have panels been fixed into substrate with correct length and correct number of fixing as per specification?<br><br>I. Panels area of less than 10m2 to be fixed with 9no of fixings.<br>II. Panels area between 10-18 m to be fixed with 12no of fixings.<br>III. Panels area of more than 18m2 to be fixed with 16 no of fixings.

  • Add media

  • 49. Has specified/recommended PU Foam been injected to an abutment chamber using a system designed pistol applicator?

  • Add media

  • 50. Have specified/recommended PU cutters and plugs been used, so as to make sure that facade is watertight?

  • Add media

  • 50.1 Has glue used for fixing single brick slips been properly mixed and used within 3 hours from mixing ?

  • Add media

  • 50.2 Has whole surface of the brick slip been covered with adhesive ?

  • 51. Have abutments of the elements been stitched together with matching single brick slip glued into the location with specified adhesive, so as to stretcher bond pattern of bricks was achieved?

  • Add media

  • 52. Have all locations of fixings and abutments of the elements been pointed with recommended mortar, so as to traditional brick appearance was maintained?

  • Add media

  • 53. Have specified compressible sealant and additional flexible sealant been used at points where panels join Cills and frames of the openings?<br><br>(Reference: Gebrik installation guide, jamb detail D07, and cill detail drawings D06)

  • Add media

Inspection results:

  • Signed off by the project manager?

  • Signed off by the main contractor representative:

F. Alucabond Panels/ Subframe setting

  • 54. Have subframe brackets been installed in accordance with the subframe layout drawings?<br>

  • Add media

  • 55. Have T-rails been fixed into brackets through specified holes, so as to permit thermal movement of the T-rail.<br>(Fixing Point Brackets - 2 fixings through fixed holes and <br>

  • Add media

  • 56. 4. Have thermal pads been installed behind brackets?<br>

  • Add media

  • Add media

  • 59. Have brackets been fixed at stud locations?<br>

  • Add media

  • Add media

  • 58. Have bracket fixings been torqued correctly using correct torque drill?( was the screw driver sat at correct torque)?<br>

  • 60. Have Horizontal Suport Profiles been fixed in accordance with the spacing indicated on the panel production drawings?

  • Add media

  • 61. Have horizontal support Profiles been fixed to T-profiles with minimum 2 fixings/per connection?

  • Add media

  • 62. Has a gap of 5-10mm been maintained between each length of horizontal Support Profile?<br>

  • Add media

  • 64. Have rails been set with rotating laser?<br>

  • Add media

  • Add media

  • 65. Has the Project Manager checked the level with string line or laser?<br>

  • Add media

  • 66. Has there been one dead fixing per rail minimum?

  • Add media

  • 67. Is the top and bottom of the rails overhanging no more than indicated on the rail setting drawing.?<br>

  • Add media

G. Insulation

  • 68. Have fire barriers been fitted and at correct locations?<br>

  • Add media

  • 69. Have fire breaks been mitered at the edges of the façade so as to provide continuity of intumescent layer.?

  • 71. Have fire pins been installed minimum one per board?<br>

  • Add media

  • 72. Has insulation been fitted as tight as possible?<br>

  • Add media

  • 73. Have all outlets, brackets, vents, edges of insulation board, joints etc. been taped up with silver tape?

  • Add media

H. Cladding Panels

  • 74. Have drilling holes in rail been made of proper size?<br>

  • Add media

  • 75. Have drilling holes in panels been made of diameter of proper/specified size, (centralising tool must be used as per Reference Booklet Drawing No. D04)

  • Add media

  • 76. Has rivet spacer nose piece been used on all rivet guns? <br>Rivet spacer nose piece as per specification Reference Drawing No. D05 (see MClarke reference booklet D05)<br><br>

  • Add media

  • 77. Has the trespa been held tight against rails during fixing stage, especially at facets?<br>

  • 80. Has Flymesh been fitted at base and at cill location?<br>

  • 81. Has the cladding been hose tested?<br>

  • Add media

I. Post installation checks.

  • 82. Has plant used. E.g. Cherry Pickers, scissor lifts been cleaned? Is plant ready for off hiring ? Have containers and tool boxes been emptied and checked for damages before making request of off-hire?<br>

  • Add media

  • 83. Has adequate protection been used?<br>

  • Add media

  • 84. Has work area been left clean on completion?<br>

  • Add media

  • signed by main contractor representative.

  • signed by project/contract manager.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.