Information
-
Month/Document No.
-
Main Contractor
-
Site
-
Elevation assessed & works completed.
-
Location
-
Conducted on
-
Prepared by
-
Persons Carrying out work to Area being Accessed
-
Rules of WIR and Progress Reporting
1. All reports need to be in for the dates that have been agreed on the reporting timetable. If there are any reports missing the reporting manager (AS) needs to make contact with the contracts manager (JHL), finding out why reports are missing and getting confirmation when they will be in. Everybody needs to remember that there is a maximum of three working days over date of when the report needs to be in. It is not an option for reports not be done after three days.
2. Generally, there should be reports prepared for each elevation, where all assessed levels are listed. Each single report may include more than one elevation. However, it must be clearly described in the introduction which facades have been examined and what works have been completed during the assessment.
3. When job is being handed over to the project manager/contracts manager, the Reporting manager must prepare a construction plan drawing of the project, number each elevation and then refer to these numbers when conducting Work Inspections.
4. Construction plan layout drawings with numbered elevations must be saved onto the M Clarkes reporting folder on the Network. Jobs/Projects/Quality.
5. Each report should include in the introduction (cover page of report) description of the assessed façade (assigned number) along with the description of type of works which were completed as assessed façade (assigned number) along with description of type of works which were completed and assessed by project manager.
6. We have issued standard detail drawings reference numbers D01, D02, D03, D04, D05 and so on. These are available in "M Clarkes Guidance Booklet” and need to be referred to throughout WIR and clearly show what is required.
7. The report with error/failure marked RED, must be saved on the system. The next report that will follow must show how the error was rectified. If improvement was not possible, eg: due to soft ground/lack of access, it needs to be described/explained. The answers column still needs to be highlighted red. However, if the error was rectified the section should be changed to green. The comment section is to be used for explanations of how and when error was rectified.
8. If project manager has found an error during the assessment, it must be noted and fixed before consecutive stages of works progresses, eg: CP board cannot start before Metsec sub frame is properly fixed. Quality Control Manager cannot accept the next WIR report until everything is fixed and up to date on the previous report. This is to make sure that all errors are corrected, and there are no error omissions.
9. Progress reports need to be genuine and relevant.
10. It is important that progress reports always have delay events.
11. All reports have to be sent to main contractor and subcontractor -
Elevation assessed & works completed.
-
Completed by Subcontractors:
Part A. SFS Metsec
-
-
1. Have the SFS been given status and passed by the architect?<br>
-
Add media
-
2. Has the operative been given the relevant drawings and details to complete the works.?<br>
-
Add media
-
3. Is the wall constructed using the correct depth and gauge of studs/trucks?<br>
-
Add media
-
4. Are operatives using the correct track fixings? Are the tracks fixed/installed to concrete at correct centres?<br>
-
Add media
-
5. Are the operatives using the correct 'tek' screws for installing studs?<br>
-
Add media
-
6. Have the studs been installed to suit cladding joints locations?
-
Add media
-
7. Has the wall been set out to the correct Gridline offset? In the correct location?<br><br>
-
Add media
-
8. Have the compound sills and lintels been fixed together at centres of no more than 300 mm?<br><br><br><br>
-
Add media
-
9. Have the openings been formed in the correct locations? At correct height, length and width?<br><br>
-
Add media
-
10. Are the openings being formed using the correct studs/tracks compounds as per approved design specification?<br><br>
-
Add media
-
11. Have deflection heads been installed correctly with the required movement allowance?<br><br><br>
-
Add media
-
12. Have the works been completed to the current outline specification and manufacturers specification? (including windows and doors openings)<br><br>
-
Add media
-
13. Have the works been completed to current revised SFS drawings and details?<br><br>
-
Add media
-
14. Has VB bracing been installed as required?<br><br>
-
Add media
-
15. Is the wall completed to a true line and level?<br><br>
-
Add media
Inspection result/comments.
-
Signed off by Contract Manager
-
Signed off by Main Contractor
-
Signed off by Project Manager
A1. Cement Boarding and sealing.
-
1. Has the CP - Board of correct/specified type and thickness been installed?
-
Add media
-
2. Are the boards installed in a stretcher bond fashion?<br>
-
Add media
-
3. Are there 5mm joints around all edges?<br>
-
Add media
-
4. Has there been a 15mm gap left for floor deflection joints ?(Drawing Reference: D01, see MClarke reference booklet)<br>
-
Add media
-
5. Have the screws been fixed correctly (not over tight) into boards, using Nose Piece?(Drawing Reference: D02. See MClarke reference booklet)<br>
-
Add media
-
6. Have the correct number of fixings(minimum of 25) been installed to each board?<br>
-
Add media
-
7. Has the CP board been installed with no bumps, gaps, and bows?<br>
-
Add media
-
8. Was Daffa tape applied to all CP Board joints?<br>
-
Add media
-
9. Has the EPDM been installed to deflection joints and concrete interfaces?<br>
-
Add media
-
10. Is CP Board fixed correctly at deflection track from floor to floor? Fixed to track and not studs?<br>
-
Add media
Inspection result/comments.
-
Signed off by Project Manager
-
Signed off by Main Contractor
-
Signed off by Contract Manager
PART. B. PREPARATION FOR RAINSCREEN CLADDING - ALUCABOND/THERMOWOOD/TERRACOTTA/GLASS ETC
-
1. Have the Operatives been provided with sufficient training in the specified system?
-
Add media
-
2. Has the operative been given the relevant drawings and details to complete the works?
-
Add media
-
3. Have the windows / curtain wall / doors been installed to correct levels and handed over to main contractor?
-
Add media
-
4. Are EPDM's correctly installed?
-
Add media
-
5. Is the wall substructure to correct line and level?
-
Add media
Inspection result/comments.
-
Signed off by Contract Manager
-
Signed off by Project Manager
-
Signed off by Main Contractor
B1. WINDOWS/ FLASHING / PODS / CILL CORNER TRIMS
-
1.Has site dimension survey been carried out to confirm elevation panels sizes and updated to MClarke Panel Drawing?
-
Add media
-
2. Are cills, pods and flashings installed to the correct design details? Thickness, colour and depth?
-
Add media
-
3. Are cills, pods and flashings installed using correct fixings and fixing centres?
-
Add media
-
4. Are cills, pods and flashings installed to suit correct locations ?
-
Add media
-
5. Are Cills op proper quality and shape?<br>
-
Add media
-
6. Are window supports fixed properly?(are correct packers used, are fixings long enough?)
-
Add media
-
7. Are windows set to correct Centre Line horizontally and vertically within structural opening?
-
Add media
-
8. Is the face of the windows position to the correct offset.?
-
Add media
-
9. Are all adjacent windows aligned with each other?
-
Add media
Inspection result/comments.
-
Signed off by Main Contractor
-
Signed of by Contract Manager
-
Signed off by Project Manager
B2. BREATHER MEMBRANE
-
1. Have all vents, brackets, rainwater pipes been taken through the CP board and handed over to the main contractor?
-
Add media
-
2. Has EPDM been installed to all vents, rwp's/louvre bracket fixing centres?
-
Add media
-
3. Has the correct and specified breather membrane been installed?
-
Add media
-
4. Has the breather membrane been dressed out and over horizontal flashings / pods and taped and sealed?
-
Add media
-
5. Has breather membrane been taped at vertical joints and overlapped 300mm at horizontal joints?
-
Add media
-
6. Has the breather membrane been taped to and around all openings protrusions, as specified on the Reference Drawing D 03 (see MClarke reference booklet)
-
Add media
-
7. Have all parts of EPDM properly overlapped and secured with Dafa tape?<br>
-
Add media
-
8. Have all location of EPDM, where fixings/bolts had to go through been secured/sealed with silicone?<br>
-
Add media
Inspection result/comments.
-
Signed by the Contract Manager.
-
Signed by the Project Manager.
-
Signed by the Main Contractor.
B3. Subframe settings.
-
1. Have subframe brackets been installed in accordance with the subframe layout drawings?
-
Add media
-
2. Are there minimum of 3 number of brackets on 3 meters long T-rail? (depending on loads, higher elevation may need more brackets e.g. the very top level and the end of the wall- corners)<br>
-
Add media
-
3. Have T-rails been fixed into brackets through specified holes, so as to permit thermal movement of the T-rail.<br>(Fixing Point Brackets - 2 fixings through fixed holes and <br>Gliding Point Brackets- 2 fixing through holes which will permit movement)<br>
-
Add media
-
4. Have thermal pads been installed behind brackets?
-
Add media
-
5. Have correct type and number of fixings been used on brackets?
-
Add media
-
6. Have bracket fixings been torqued correctly using correct torque drill?( was the screw driver sat at correct torque)
-
Add media
-
7. Have brackets been fixed at stud locations?
-
Add media
-
8. Have Sto Horizontal Suport Profiles been fixed in accordance with the spacing indicated on the panel production drawings?<br>
-
Add media
-
9. Have horizontal support Profiles been fixed to T-profiles with minimum 2 fixings/per connection?(distance between fixings must be minimum 25mm)<br>
-
Add media
-
10. Has a gap of 5-10mm been maintained between each length of horizontal Support Profile?<br>
-
Add media
-
11. Have rails been set out in accordance with deflection point location.<br>.
-
Add media
-
12. Have rails been set with rotating laser?
-
Add media
-
13. Has the Project Manager checked the level with string line or laser?
-
Add media
-
14. Has there been one dead fixing per rail minimum?<br>.
-
Add media
-
15. Is the top and bottom of the rails overhanging no more than 550mm? (No more than indicated on the rail setting drawing)
-
Add media
Inspection result/comments.
-
Signed off by the Contract Manager.
-
Signed off by the Project Manager.
-
Signed off by the Main Contractor.
B4. INSULATION / TAPING
-
1. Have fire barriers been fitted and at correct locations?
-
Add media
-
2. Have fire breaks been mitered at the edges of the facade so as to provide continuity of intumescent layer.?<br>
-
Add media
-
3. Has proper pattern of mechanical fixing been used ?.(Reference, see Figure 7, M.Clarke Guidance Booklet.)<br>
-
Add media
-
4. Have fire pins been installed minimum one per board?<br>
-
Add media
-
5. Has insulation been fitted as tight as possible?
-
Add media
-
6. Have all outlets, brackets, vents, edges of insulation boards, joints etc. been taped up with silver tape?<br>
-
Add media
Inspection result/comments.
-
Signed off by Project Manager.
-
Signed off by Contract Manager.
-
Signed off by Main Contractor.
C. ALUCABOND-CLADDING INSTALLATION
-
1. Have drilling holes in rail been made no bigger than 5mm?<br><br>
-
Add media
-
2. Have drilling holes in trespa been made of diameter of 8mm, with exception for one hole in the middle of the board, which must be 5mm ?.(centralising tool must be used as per Reference Booklet Drawing No. D04)<br>
-
Add media
-
3. . Has rivet spacer nose piece been used on all rivet guns? <br>Rivet spacer nose piece as per specification Reference Drawing No. D05 (see MClarke reference booklet D05)<br>
-
Add media
-
4. Has the trespa been held tight against rails during fixing stage, especially at facets?<br>
-
Add media
-
5. Have small rails been put onto head rails before trespa was fixed?<br>
-
Add media
-
6. Has fire break been maintained away at correct distance from Alucabond panel(as per assessed project/drawing)?
-
Add media
-
7. Has Flymesh been fitted at base and at cill location?
-
Add media
-
8. Has the cladding been hose tested?
-
Add media
-
Signed off by Project Manager
-
Signed off by Main Contractor
-
Add media
-
Comments:
D. Insulated Render
-
1. Has the applicator been given all detail drawings, levels, locations of firebreak expansion beads?<br>
-
1.1 Have horse shoe packers been used?
-
1.2 Has starting bead been fitted with correct fixings and at correct centres?
-
2. Has the applicator been given information of what way the adhesive is applied to board(dabs, grated trowel or picture frame).?<br>
-
3. Have all down pipes, vents, grounds, brackets etc. been installed on the wall and properly sealed?<br>
-
4. If permanent cappings are not in place, are temporary cappings on?<br>
-
5. Has the wall been checked for straightness before mesh was applied?<br>
-
6. Have all door frames and window frames been over lapped by insulation at a minimum of 10 mm in order to ensure of good sealing?<br>
-
7. Are down pipes on?<br>
-
8. Has mesh been properly overlapped at joints?<br>
-
9. Have additional mesh reinforcement been added to the insulation surface at four corners of the openings?<br>
-
10. Were insulation boards additionally fixed to the substrate with proper number of mechanical fixings?<br>
-
11. Have two number of base coat been applied and sponged ?<br>
-
12. Has all protection been done?<br>
-
13. Is the wall suitable for application of the Acrylic coat? (Weather forecast must be checked before application)<br>
-
14. Is wall dry and free from bumps and hollows before application of Final coat?( must be checked with 2m straight edge)<br>
-
Comments
-
Add media
-
Signed by Project Manager
-
Signed by Main Contractor
D. Capping.
-
1. Has proper angle support been fitted to the substrate?
-
Add media
-
2. Has proper plywood been used.?<br>(Marine plywood must be used in all location where there is a damp, condensation risk)
-
Add media
-
3. Has plywood been covered with breather membrane or bituminous felt?
-
Add media
-
4. Have proper fixings been used?<br><br>It must be remembered that fixings have to be in superior anti-bio metal corrosion quality to the elements which are fastened by the fixings, e.g. Zinc coated(galvanised) steel fixings can not be used for fixing aluminium elements. It most situations stainless steel would be the safest option.<br><br>
-
Add media
-
5. Has proper number of fixing been used, as per drawings/specification?
-
Add media
-
6. Has proper sealing tape and sealing mastic been used as per design/specification?
-
Add media
-
7. Are capping set to a consistent and even horizontal line.?
-
Add media
Inspection result
-
Site notes
-
Signed off: Contract Manager
-
Signed off: Main Contractor
-
Signed by Project Manager.
-
Should you have any enquiries regarding this inspection report please contact M Clarke & Sons on 02825822500.