Title Page
-
Project number:
-
Site location:
-
Inspection Date & Time:
-
Installer's Name:
Site
-
Verify the following:
-
1. Cleanliness (accumulation of debris around or <br>under the array).
-
2. No shading of the array.
- No shading
- AM shading
- PM shading
PV Modules
-
Verify cleanliness (accumulation of dust or fungus on <br>array).
-
Check for visual defects including:
-
1. Fractures:
-
2. Browning:
-
3. Moisture penetration:
-
4. frame corrosion:
Inspect junction boxes for —
-
1. Tightness of connections:
-
2. Water accumulation/build-up:
-
3. Integrity of lid seals:
-
4. Integrity of cable entrance, glands and conduit <br>sealing:
-
5. Integrity of clamping devices.
Wiring Installation