Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site setup and maintenance
-
Identify which ACMs are to be removed in agreement with the client
- AIB
- Cement Products
- Hand Applied Lagging
- Sectional Lagging
- Textured Coating
- Thermoplastic floor tiles
- other ACM
-
Check certificates for NPUs & H-type vac
-
Check negative pressure for the enclosure
-
Ensure that the viewing panels or CCTV are situated so that all working areas can be viewed
Decontamination
-
Check that the DCU has been set up correctly and is ready for use
-
Check that the DCU has been cleaned and is free from debris
-
Check certificates for the DCU NPU, Gas test & DCU clearance
-
Ensure that Operatives are following correct decontamination procedures
Controlled stripping techniques
-
Inspect all equipment to ensure that it is safe and in good working order
-
Check all equipment records to ensure that they are in date
-
Ensure that Operatives are using correct stripping techniques
-
Monitor the effectiveness of fibre control and record information
PPE / RPE
-
Demonstrate correct use, wearing and removal of all PPE / RPE
-
Visually inspect all PPE / RPE prior to its use
-
Maintain all PPE / RPE and use the appropriate storage facility
-
Report and lost or defective PPE / RPE
-
Ensure that the correct PPE / RPE is being worn correctly at all times when required ( including setting up and waste transiting)
Cleaning and Clearance air testing
-
Explain cleaning and clearance requirements ( including 4-stage if required)
-
Carry out a visual inspection of the work area after stripping is complete
-
Explain the requirements of the analyst before clearance and inspection and sampling
-
Collect all clearance certificates from the Analyst including Area, DCU & van
Documentation
-
Know how to read and understand the tasks which are set out the method statement
-
Know how to read and understand the information which is set out in the ASB5
-
Know how to read and understand the requirements of the relevant risk assessments for the above tasks
-
Explain the importance of explaining the above information to the Operatives
-
Explain the process for changing the method statement and give an example why this might have to be done
Fault Finding
-
Explain how to spot and rectify problems with TWO of the following: (assessor to choose)
- Wetting of ACMs
- RPE
- Airlocks
- Enclosures
- DCU
- Method Statement
- Risk Assessments
- Signage
-
Explaining the importance of record keeping
-
Describe the fault reporting procedures
Emergency Procedures
-
Describe the correct procedure for dealing with ONE of the following emergencies:
- Major or Minor injury in a live enclosure
- Fire
- release of gas or radioactive dust
- Asbestos leak outside of the enclosure
- Loss of power to the respirator
- Loss of power to the NPU
- Complete loss of electrical power
- Collapse of the enclosure
- loss of water supply to the DCU