Title Page
-
Site - Location.
-
Conducted on.
-
Prepared by.
-
Signed by.
Arrival On Site
-
Names of IFS Operatives on site.
-
Have all IFS operatives singed in to the visitors book.
-
Are all IFS operatives aware of the scheme fire policy if alarm sounds.
-
Are all IFS operatives aware of scheme fire muster points.
IFS RISK ASSESSMENT AND METHOD STATEMENT
-
RAMS have been prepared for this project. Have they been read and understood.
-
Names of IFS operatives on site.
-
Have the IFS RAMS been delivered to the operatives on site?
-
Have the IFS operatives understood the risk assessment and method statement.
-
Please sign to confirm IFS RAMS have been understood.
-
Please upload image of IFS Communication Sheet.
-
I Can confirm that all additional IFS operatives will be inducted before work starts on site.
SITE HOUSE KEEPING
-
Has operative parking been discussed with the customer.
-
Have we agreed a safe entry and exit for the customer.
-
Has a safe delivery area been prepared on site.
-
Have we discussed with the customer our plan of works.
-
Are IFS work areas safe and secure.
-
Has a safe storage area been prepared on site.
-
Is the IFS TIDIENESS POLICY being observed.
-
Has a Safe cutting area been established to avoid the creation of dust inside the building.
GENERAL HEALTH AND SAFETY
-
Are all operatives suitably dressed in IFS labelled uniform.
-
Is the correct PPE being used for the task.
-
Are Materials being transferred with a two man lift.
-
Have all material routes been planned and clear of obstruction.
-
Are tools and materials being stored safely.
-
Has the correct access equipment been selected for the task.