Title Page
-
Supplier Name
-
Location
-
Date of Visit
-
Audit by
-
SMIL Plant
- SMIL Sipcot
- SMIL MWC
- SMIL Chakan Plant#1
- SMIL Chakan Plant#2
- SMIL Nashik Plant#1
- SMIL Nashik Plant#2
- SMIL Sanand
- CQ
-
Visit Objectives
- Addressing of Quality issues form OEM / Field / SMIL Line
- Verification of Corrective Action's Effectiveness for Quality Complaints
- Verification of FTG Status
- Control of Deviation from Process / Product
- Verification of Supplier Process 4M Changes
- RM & Special process Validation Status
RM & Special process Validation Status
-
Is the Supplier Received MTC from Mill or Trader for each Lot?
-
Does the supplier verify the Raw Material with a third party laboratory for every heat change?
-
Does the supplier provide a seal and signature to verify MTC and third-party test reports?
-
Does the supplier performing their Special process Validation for defined intervals?
-
Does the supplier verify the Special process requirements with a third party laboratory for once in a three months?
-
Does the supplier receive the validation report for each lot from Tier-3 vendors for the special process?
Addressing of Quality issues form OEM / Field / SMIL Line
Product & Complaints Details
-
Child Part Name
-
SMIL Assy. Name & Model
-
Problem Statement
-
Reported Date
-
Reported Date
-
Reported At
Containment, Root Cause, & Corrective Action Status
-
Does the supplier taken containment actions for their available stock?
-
Has the supplier identified and verified the root cause of system, occurrence and detection failures?
-
Has the supplier implemented corrective actions across against system, occurrence, and detection failures?
-
Is the Implemented actions are Effective?
-
Are corrective actions Deployed for similar product and processes?
-
Overall Observation:-
Verification of Corrective Action's Effectiveness for Quality Complaints
-
Are the Implemented Actions Active?
-
Is the Failure did not Re-occurrence against the Implemented Corrective Actions?
-
Are corrective actions Deployed for similar product and processes?
-
Are the Inspectors and Operator aware of the Complaints and Action? Are Quality Alerts displayed on the Work Station?
-
Overall Observations
Verification of Supplier Process 4M Changes
Product & 4M Change Details
-
Child Part Name
-
SMIL Assy. Name & Model
-
Nature of Change
-
If Temporary change Specify the Period
-
If Temporary change Specify the Qty.
-
ECN/PCN Status
- ECN
- PCN
-
4M Change Descriptions
4M Changes Progress & Approval Status
-
Is the Updated Drawing evident for ECN?
-
Type of Change
- Man Related
- Machine Related
- Material Related
- Method Related
-
Man Related
- New Operator Deputed
- Operator in Long
- Operator Met Accident
- Others If Any
- NA
-
Description
-
Machine Related
- Approved M/c Change
- M/c Relocated
- Modification in Tool
- Modification in Fixtures
- Machine / Tool Break Down
- Poka-Yoke Not work
- Others If Any
- NA
-
Description
-
Material Related
- RM Source change
- RM Grade Change
- RM Spec. Variation
- Others If Any
- NA
-
Description
-
Method Related
- Process out sourced
- Packing Std. Change
- Inspection Method Change
- Process Added / Removed
- Process Sequence Change
- Sub Supplier Change
- Layout Change
- Others If Any
- NA
-
Description
-
Are the FTG Modification Completed? (If Applicable)
-
Is Process/Product Validation done?
-
Is PPAP / ISIR Approved from SMIL?
-
Overall Observation
Verification of FTG Status
-
Does the supplier follow the history card for all corrections and adhere to the PM for tools and fixtures?
-
Is the Fixture / Tool / Gauges conditions are maintained properly and Stored with appropriate location?
-
Is the Critical tools are identified and planned predicative maintained?
-
Is the following elements Monitoring in tool?<br>1. Appropriate Stopper Locating Pin & Blocks for trim & Piecing tools<br>2. Height of the setting block should maintain equally and ensure setting block bottoming<br>3. Pillars / pillar bush are effectively fastened<br>4. All bolts/dowels/springs are in place and secured well. Rubber bush/cover status<br>5.Presence of Locating pin / Block profile locator and no play after placing the part<br>6.Check locating pins/ locator condition for damage free<br>7.Check the presence of error proofing in the die <br>8.Check the cutting edge condition and clearance<br>9.Check all sharp edges/cutting edges of punches for damage/blunt edges<br>10. Check the gas springs are in good condition<br>(No Gas leak, No damage in seal )
-
Are Gauge Calibrations Completed According to Planned Intervals?
-
Overall Observation:-
Control of Deviation from Process / Product
Product & Deviation Details
-
Product Name / Number
-
Deviation Descriptions
-
Deviation Qty
-
Type of Deviation
-
If Product Deviation
- Dimension
- Material
- Aesthetic
- Fit & Function
Status Of Deviation
-
Is the Supplier Taken Rework Containment?
-
Is the Supplier Taken Action on the deviation?
-
Is the Deviation Approved by SMIL?
-
SMIL Comments
-
Auditor(SMIL) Signature
-
Auditee(Supplier) Signature
-
Verified (SMIL Plant QH) Signature