Title Page

  • Supplier Name

  • Location
  • Date of Visit

  • Audit by

  • SMIL Plant

  • Visit Objectives

RM & Special process Validation Status

  • Is the Supplier Received MTC from Mill or Trader for each Lot?

  • Does the supplier verify the Raw Material with a third party laboratory for every heat change?

  • Does the supplier provide a seal and signature to verify MTC and third-party test reports?

  • Does the supplier performing their Special process Validation for defined intervals?

  • Does the supplier verify the Special process requirements with a third party laboratory for once in a three months?

  • Does the supplier receive the validation report for each lot from Tier-3 vendors for the special process?

Addressing of Quality issues form OEM / Field / SMIL Line

Product & Complaints Details

  • Child Part Name

  • SMIL Assy. Name & Model

  • Problem Statement

  • Reported Date

  • Reported Date

  • Reported At

Containment, Root Cause, & Corrective Action Status

  • Does the supplier taken containment actions for their available stock?

  • Has the supplier identified and verified the root cause of system, occurrence and detection failures?

  • Has the supplier implemented corrective actions across against system, occurrence, and detection failures?

  • Is the Implemented actions are Effective?

  • Are corrective actions Deployed for similar product and processes?

  • Overall Observation:-

Verification of Corrective Action's Effectiveness for Quality Complaints

  • Are the Implemented Actions Active?

  • Is the Failure did not Re-occurrence against the Implemented Corrective Actions?

  • Are corrective actions Deployed for similar product and processes?

  • Are the Inspectors and Operator aware of the Complaints and Action? Are Quality Alerts displayed on the Work Station?

  • Overall Observations

Verification of Supplier Process 4M Changes

Product & 4M Change Details

  • Child Part Name

  • SMIL Assy. Name & Model

  • Nature of Change

  • If Temporary change Specify the Period

  • If Temporary change Specify the Qty.

  • ECN/PCN Status

  • 4M Change Descriptions

4M Changes Progress & Approval Status

  • Is the Updated Drawing evident for ECN?

  • Type of Change

  • Man Related

  • Description

  • Machine Related

  • Description

  • Material Related

  • Description

  • Method Related

  • Description

  • Are the FTG Modification Completed? (If Applicable)

  • Is Process/Product Validation done?

  • Is PPAP / ISIR Approved from SMIL?

  • Overall Observation

Verification of FTG Status

  • Does the supplier follow the history card for all corrections and adhere to the PM for tools and fixtures?

  • Is the Fixture / Tool / Gauges conditions are maintained properly and Stored with appropriate location?

  • Is the Critical tools are identified and planned predicative maintained?

  • Is the following elements Monitoring in tool?<br>1. Appropriate Stopper Locating Pin & Blocks for trim & Piecing tools<br>2. Height of the setting block should maintain equally and ensure setting block bottoming<br>3. Pillars / pillar bush are effectively fastened<br>4. All bolts/dowels/springs are in place and secured well. Rubber bush/cover status<br>5.Presence of Locating pin / Block profile locator and no play after placing the part<br>6.Check locating pins/ locator condition for damage free<br>7.Check the presence of error proofing in the die <br>8.Check the cutting edge condition and clearance<br>9.Check all sharp edges/cutting edges of punches for damage/blunt edges<br>10. Check the gas springs are in good condition<br>(No Gas leak, No damage in seal )

  • Are Gauge Calibrations Completed According to Planned Intervals?

  • Overall Observation:-

Control of Deviation from Process / Product

Product & Deviation Details

  • Product Name / Number

  • Deviation Descriptions

  • Deviation Qty

  • Type of Deviation

  • If Product Deviation

Status Of Deviation

  • Is the Supplier Taken Rework Containment?

  • Is the Supplier Taken Action on the deviation?

  • Is the Deviation Approved by SMIL?

  • SMIL Comments

  • Auditor(SMIL) Signature

  • Auditee(Supplier) Signature

  • Verified (SMIL Plant QH) Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.