Title Page
-
Uttam Foundries & Ispat Pvt. Ltd.
-
Report Number
-
Prepared by
-
Audit started on
-
Part Name
-
Item Code (UF)
-
Drawing number (customer) with revision
-
Purpose of audit
Documentation
-
Latest revision Balooned Drawing hard copy available and stored in master file. Confirm with purchase order
-
Latest revision Balooned drawing soft copy available in master folder and document master updated
-
Latest revision stage drawings are available and issued to production
-
Stage drawings match with FSIR, IPIR in all respects. No dimensions missing
-
All stage drawings are listed and controlled with revision numbers and details and added in document master
-
Obsolete drawings and documents in hard master file are marked clearly and disposed off
-
Obsolete drawings and documents in soft master folder are marked clearly and stored in correct folder
-
PFD and control plan available in the latest format with latest revision and document master updated
-
Control method of KCC parameters in the control plan follows the Poka yoke, SPC or 100% inspection rule
-
Ballooned dimensions in Ballooned drawing and control plan match
-
LIR matches with control plan in all respects including tolerances, MMD (with Least count) and characteristic
-
Audit summary sheet matches with control plan in all respects including tolerances, MMD (with Least count) and characteristic
-
All excel files in master folder are in the latest excel format and file type
-
Drawings of all jigs, fixtures and special tools available and controlled
-
Customer approved packaging standard available and controlled
-
Solid model of Casting, pattern, layout and gating available and controlled
Batch sheet verification according to control plan
-
Batch sheet matches with control plan in all respects including tolerances, MMD (with Least count), characteristic, process flow, inspection frequencies, etc.
-
Operation sequence, numbering and nomenclature with machine type mentioned and matches with CP
-
IPIR matches with control plan in all respects including tolerances, MMD (with Least count), characteristic, inspection frequencies, etc.
-
FSIR matches with control plan in all respects including tolerances, MMD (with Least count), characteristic, inspection frequencies, etc.
-
Correct format of batch sheet is used and pdf print copy available in soft is of the latest revision?
-
Does PDI report match with the Component quality standard provided by customer? Is it appropriate?
-
Operation 90 (Manufaturing inspection) and 100 (PDI) added in batch sheet
-
Is PDI and Visual encyclopedia page available for this part for all major characteristics?
-
If part is bought out, has PDI check sheet been provided to supplier with confirmation of receipt?
Physical Inspection and verification
-
Does the actual process flow match with the approved PFD
-
Are approved NC programs being used
-
Is the correct machinery and equipment, as defined in control plan, being used
-
Jigs and fixtures being used are approved and as defined in control plan
-
Measuring and monitoring devices being used are as per control plan
-
Calibrated jigs fixtures are being used with ID clearly visible
-
Calibrated MMD are being used wit ID clearly visible
-
Are the MMD being used adequate for the tolerance of the parameters being checked?
-
If part is bought out, is the supplier sending duly completed PDI reports with each lot?
-
Verify whether control method of KCC parameters as defined in CP is being completely followed
-
Verify effectiveness of applied Poka Yoke as in control plan, if any
-
Packaging being done as per packaging standard
-
Audit complete date