Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Survey Type?

  • Management / Refurbishment / Demolition?

  • Does the proposed survey contain elements of more than one of the survey types above? If yes, please provide details by tapping this question box.

Premises Type?

  • Industrial / Commercial / Residential?

  • Does the proposed survey contain elements of more than one of the premise type above? If yes, please provide details by tapping this question box.

Survey Planning

  • Was a preliminary site meeting and walk through undertaken?

  • If yes, was the recommended check list used?

  • Date of meeting and those present?
  • Date of meeting?

  • Those present?

  • Was a desk top study undertaken?

  • Was the method for recording and presenting the data agreed?

  • Was a site specific risk assessment undertaken?

  • Was a site specific method statement compiled?

MANAGEMENT SURVEY

    Management Survey Audit Questions
  • Risk assessment present?

  • Method statement present?

  • Method for surveying for ACM's, 4R-200 present?

  • HSG 264 present?

  • Accident forms present?

  • LUL SPC declaration present?

  • Site Survey Report Forms, F39 present?

  • Sampling in progress signs present?

  • Is sufficient equipment on site?

  • Was a visual assessment undertaken in a competent and satisfactory manner?

BULK SAMPLING QUESTIONS

  • Is the area prepared?

  • Is appropriate PPE being worn?

  • Is a representative sample taken?

  • Was the sample collected in to?

  • Was the sample double bagged?

  • Was the sample number written on both inside and outside the bag or container?

  • If the sample is due to be subcontracted, is it labelled up as potentially containing asbestos?

  • Was the exposed sample surface encapsulated to prevent further fibre release?

  • Using what?

  • Was the sampling area cleaned?

  • Using what?

  • Was the site plan marked up satisfactorily with the sample position?

  • Was the site plan marked up satisfactorily with the extent of the material?

  • Was the sampling position on site marked with a label?

  • Was the label satisfactorily filled in?

  • Was the sample material photographed?

RECORDING RESULTS

  • Is sufficient detail recorded?

  • Is each sample material assessed?

  • Is each suspect or presumed asbestos material assessed?

  • Is the most likely asbestos type allocated to suspect or presumed materials?

  • Are there any arguments for materials that are judged to be non-asbestos?

  • If there is inadequate evidence to support a reasoned argument that a material is non-asbestos e.g. Textured plaster, vinyl flooring, is the material sampled?

  • Are the sheets completed?

  • Are the sheets signed?

  • Hazard rating - Are the hazard ratings correctly calculated?

REFURBISHMENT SURVEY

    Refurbishment Survey Audit Questions
  • Risk assessment present?

  • Method statement present?

  • Method for surveying for ACM's, 4R-200 present?

  • HSG 264 present?

  • Accident forms present?

  • LUL SPC declaration present?

  • Site Survey Report Forms, F39 present?

  • Sampling in progress signs present?

  • Is sufficient equipment on site?

  • Was a visual assessment undertaken in a competent and satisfactory manner?

BULK SAMPLING QUESTIONS

  • Is the area prepared?

  • Is appropriate PPE being worn?

  • Is a representative sample taken?

  • Was the sample collected into?

  • Was the sample double bagged?

  • Was the sample number written on both inside and outside the bag or container?

  • If the sample is due to be subcontracted, is it labelled up as potentially containing asbestos?

  • Was the exposed sample surface encapsulated to prevent further fibre release?

  • Using what?

  • Was the sampling area cleaned?

  • Using what?

  • Was the site plan marked up satisfactorily with the sample position?

  • Was the site plan marked up satisfactorily with the extent of the material?

  • Was the sampling position on site marked with a label?

  • Was the label satisfactorily filled in?

  • Was the sample material photographed?

RECORDING RESULTS

  • Is sufficient detail recorded?

  • Are there any arguments for materials that are judged to be non-asbestos?

  • If there is inadequate evidence to support a reasoned argument that a material is non-asbestos e.g. Textured plaster, vinyl flooring, is the material sampled?

  • Are the sheets completed?

  • Are the sheets signed?

DEMOLITION SURVEY

    Demolition Survey Audit Questions
  • Risk assessment present?

  • Method statement present?

  • Method for surveying for ACM's, 4R-200 present?

  • HSG 264 present?

  • Accident forms present?

  • LUL SPC declaration present?

  • Site Survey Report Forms, F39 present?

  • Sampling in progress signs present?

  • Is sufficient equipment on site (Refer to Appendix 2 of the method)?

  • Was a visual assessment undertaken in a competent and satisfactory manner?

BULK SAMPLING QUESTIONS

  • Is the area prepared?

  • Is appropriate PPE being worn?

  • Is a representative sample taken?

  • Was the sample collected into?

  • Was the sample double bagged?

  • Was the sample number written on both inside and outside the bag or container?

  • If the sample is due to be subcontracted, is it labelled up as potentially containing asbestos?

  • Was the exposed sample surface encapsulated to prevent further fibre release?

  • Using what?

  • Was the sampling area cleaned?

  • Using what?

  • Was the site plan marked up satisfactorily with the sample position?

  • Was the site plan marked up satisfactorily with the extent of the material?

  • Was the sampling position on site marked with a label?

  • Was the label satisfactorily filled in?

  • Was the sample material photographed?

RECORDING RESULTS

  • Is sufficient detail recorded?

  • Are there any arguments for materials that are judged to be non-asbestos?

  • If there is inadequate evidence to support a reasoned argument that a material is non-asbestos e.g. Textured plaster, vinyl flooring, is the material sampled?

  • Are the sheets completed?

  • Are the sheets signed?

REPORTING RESULTS - DOES THE REPORT INCLUDE:

  • Site address of premises surveyed?

  • Date of the survey?

  • Purpose of the survey and / or summary of the Client's instructions?

  • Description of the buildings or areas included in the survey?

  • A description of and buildings or sections of buildings or areas specifically excluded from the survey by the Client?

  • The survey method used I.e. HSG 264 and 4R-E200?

  • The type of survey undertaken e.g. Refurbishment / demolition?

  • Any variations or deviations from the method or Client's requirements?

  • Bulk analysis results?

  • COMMENTS?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.