Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Survey Type?
-
Management / Refurbishment / Demolition?
- wipes
- vacuum
-
Does the proposed survey contain elements of more than one of the survey types above? If yes, please provide details by tapping this question box.
Premises Type?
-
Industrial / Commercial / Residential?
- wipes
- vacuum
-
Does the proposed survey contain elements of more than one of the premise type above? If yes, please provide details by tapping this question box.
Survey Planning
-
Was a preliminary site meeting and walk through undertaken?
-
If yes, was the recommended check list used?
Date of meeting and those present?
-
Date of meeting?
-
Those present?
-
Was a desk top study undertaken?
-
Was the method for recording and presenting the data agreed?
-
Was a site specific risk assessment undertaken?
-
Was a site specific method statement compiled?
MANAGEMENT SURVEY
-
Management Survey Audit Questions
-
Risk assessment present?
-
Method statement present?
-
Method for surveying for ACM's, 4R-200 present?
-
HSG 264 present?
-
Accident forms present?
-
LUL SPC declaration present?
-
Site Survey Report Forms, F39 present?
-
Sampling in progress signs present?
-
Is sufficient equipment on site?
-
Was a visual assessment undertaken in a competent and satisfactory manner?
BULK SAMPLING QUESTIONS
-
Is the area prepared?
-
Is appropriate PPE being worn?
-
Is a representative sample taken?
-
Was the sample collected in to?
-
Was the sample double bagged?
-
Was the sample number written on both inside and outside the bag or container?
-
If the sample is due to be subcontracted, is it labelled up as potentially containing asbestos?
-
Was the exposed sample surface encapsulated to prevent further fibre release?
-
Using what?
-
Was the sampling area cleaned?
-
Using what?
-
Was the site plan marked up satisfactorily with the sample position?
-
Was the site plan marked up satisfactorily with the extent of the material?
-
Was the sampling position on site marked with a label?
-
Was the label satisfactorily filled in?
-
Was the sample material photographed?
RECORDING RESULTS
-
Is sufficient detail recorded?
-
Is each sample material assessed?
-
Is each suspect or presumed asbestos material assessed?
-
Is the most likely asbestos type allocated to suspect or presumed materials?
-
Are there any arguments for materials that are judged to be non-asbestos?
-
If there is inadequate evidence to support a reasoned argument that a material is non-asbestos e.g. Textured plaster, vinyl flooring, is the material sampled?
-
Are the sheets completed?
-
Are the sheets signed?
-
Hazard rating - Are the hazard ratings correctly calculated?
REFURBISHMENT SURVEY
-
Refurbishment Survey Audit Questions
-
Risk assessment present?
-
Method statement present?
-
Method for surveying for ACM's, 4R-200 present?
-
HSG 264 present?
-
Accident forms present?
-
LUL SPC declaration present?
-
Site Survey Report Forms, F39 present?
-
Sampling in progress signs present?
-
Is sufficient equipment on site?
-
Was a visual assessment undertaken in a competent and satisfactory manner?
BULK SAMPLING QUESTIONS
-
Is the area prepared?
-
Is appropriate PPE being worn?
-
Is a representative sample taken?
-
Was the sample collected into?
-
Was the sample double bagged?
-
Was the sample number written on both inside and outside the bag or container?
-
If the sample is due to be subcontracted, is it labelled up as potentially containing asbestos?
-
Was the exposed sample surface encapsulated to prevent further fibre release?
-
Using what?
-
Was the sampling area cleaned?
-
Using what?
-
Was the site plan marked up satisfactorily with the sample position?
-
Was the site plan marked up satisfactorily with the extent of the material?
-
Was the sampling position on site marked with a label?
-
Was the label satisfactorily filled in?
-
Was the sample material photographed?
RECORDING RESULTS
-
Is sufficient detail recorded?
-
Are there any arguments for materials that are judged to be non-asbestos?
-
If there is inadequate evidence to support a reasoned argument that a material is non-asbestos e.g. Textured plaster, vinyl flooring, is the material sampled?
-
Are the sheets completed?
-
Are the sheets signed?
DEMOLITION SURVEY
-
Demolition Survey Audit Questions
-
Risk assessment present?
-
Method statement present?
-
Method for surveying for ACM's, 4R-200 present?
-
HSG 264 present?
-
Accident forms present?
-
LUL SPC declaration present?
-
Site Survey Report Forms, F39 present?
-
Sampling in progress signs present?
-
Is sufficient equipment on site (Refer to Appendix 2 of the method)?
-
Was a visual assessment undertaken in a competent and satisfactory manner?
BULK SAMPLING QUESTIONS
-
Is the area prepared?
-
Is appropriate PPE being worn?
-
Is a representative sample taken?
-
Was the sample collected into?
-
Was the sample double bagged?
-
Was the sample number written on both inside and outside the bag or container?
-
If the sample is due to be subcontracted, is it labelled up as potentially containing asbestos?
-
Was the exposed sample surface encapsulated to prevent further fibre release?
-
Using what?
-
Was the sampling area cleaned?
-
Using what?
-
Was the site plan marked up satisfactorily with the sample position?
-
Was the site plan marked up satisfactorily with the extent of the material?
-
Was the sampling position on site marked with a label?
-
Was the label satisfactorily filled in?
-
Was the sample material photographed?
RECORDING RESULTS
-
Is sufficient detail recorded?
-
Are there any arguments for materials that are judged to be non-asbestos?
-
If there is inadequate evidence to support a reasoned argument that a material is non-asbestos e.g. Textured plaster, vinyl flooring, is the material sampled?
-
Are the sheets completed?
-
Are the sheets signed?
REPORTING RESULTS - DOES THE REPORT INCLUDE:
-
Site address of premises surveyed?
-
Date of the survey?
-
Purpose of the survey and / or summary of the Client's instructions?
-
Description of the buildings or areas included in the survey?
-
A description of and buildings or sections of buildings or areas specifically excluded from the survey by the Client?
-
The survey method used I.e. HSG 264 and 4R-E200?
-
The type of survey undertaken e.g. Refurbishment / demolition?
-
Any variations or deviations from the method or Client's requirements?
-
Bulk analysis results?
-
COMMENTS?