Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Accessibility

  • Main Access

(AC01) Township

  • Score 0 <br>No signage available<br><br>Score 1<br> Signage available from 2KM radius before main entrance<br><br>Score 2 <br>1.Signage available from 2KM radius before main entrance <br>2. AND Welcome entrance available<br><br>Score 3 <br>1. Signage available from >2KM radius before main entrance<br>2. AND Welcome statement available

(AC02) In-phase

  • Score 0<br>Road name not available<br><br>Score 1<br>Road name signage available<br><br>Score 2<br>1. Road name signage available <br>2. AND Road name billboard available <br>3. OR Phase name at entrance available<br><br>Score 3 <br>1. Road name signage available <br>2. AND Road name billboard available<br>3. AND Phase name at entrance available

(AC03) Construction Site

  • Score 0<br>No control access point<br><br>Score 1<br>Control access point<br><br>Score 2 <br>1. Control access point<br>2. AND Greenzone under construction<br><br>Score 3 <br>1. Control access point <br>2. AND Greenzone fully operated

(AC04) Sales Gallery

  • Score 0<br>Signage or bunting not available<br><br>Score 1<br>Signage or bunting available<br><br>Score 2<br>1. Signage or bunting available <br>2. OR Easy access from main road<br><br>Score 3<br>1. Signage and bunting available<br>2. AND Easy access from main road

  • Pavement Condition

(AC05) Road Condition

  • Score 0<br>Bad<br><br>Score 1<br>Moderate<br><br>Score 2<br>Good<br><br>Score 3<br>Excellent

Security

  • Construction Site

(SE01) Fencing or hoarding board

  • Score 0<br>Not available<br><br>Score 1<br>Available<br><br>Score 2<br>1. Available<br>2. AND According to authority guideline<br><br>Score 3<br>1. Available<br>2. AND According to authority guideline<br>3. AND Sustainability messages cited

(SE02) Security Personnel

  • Score 0<br>Not Available<br><br>Score 1<br>Available<br><br>Score 2<br>1. Available<br>2. AND Active visitor log book<br><br>Score 3<br>1. Available<br>2. AND Active visitor log book<br>3. AND Guard Post available

(SE03) Site Office

  • Score 0<br>No provided<br><br>Score 1<br>Provided / Within Greenzone area<br><br>Score 2<br>1. Provided / Within Greenzone area<br>2. AND Provide necessary lock<br><br>Score 3<br>1. Provided / Within Greenzone area<br>2. AND Provide necessary lock<br>3. AND Security device monitoring

(SE04) Materials storage/ area

  • Score 0<br>Not provided<br><br>Score 1<br>Provided / Within Greenzone area<br><br>Score 2<br>1. Provided / Within Greenzone area<br>2. AND Provide necessary lock/ control measure<br><br>Score 3<br>1. Provided / Within Greenzone area<br>2. AND Provide necessary lock/ control measure<br>3. AND Security device/system monitoring

  • Public Security

(SE05) Public security

  • Score 0<br>Not available<br><br>Score 1<br>Security personnel patrolling<br><br>Score 2<br>1. Security personnel patrolling<br>2. AND Security device monitoring<br>3. OR Police station / police booth<br><br>Score 3<br>1. Security personnel patrolling<br>2. AND Security device monitoring<br>3. AND Police station / police booth

  • Private Secuirty

(SE06) Private security

  • Score 0<br>Not available<br><br>Score 1<br>Security personnel patrolling<br><br>Score 2<br>1. Security personnel patrolling<br>2. AND Visitors screening / Active log book<br>3. OR Security device monitoring<br><br>Score 3<br>1. Security personnel patrolling<br>2. AND Visitor screening / Active log book<br>3. AND Security device monitoring

Drainage

(DR01) Public Area

  • Score 0<br>Spotted clog in average >100 meter long drainage<br><br>Score 1<br>Spotted clog in average 100 meter long drainage<br><br>Score 2<br>Spotted clog in average <100 meter long drainage<br><br>Score 3<br>None spotted

(DR 02) Private Area

  • Score 0<br>Spotted clog in average >50 meter long drainage<br><br>Score 1<br>Spotted clog in average 50 meter long drainage<br><br>Score 2<br>Spotted clog in average <50 meter long drainage<br><br>Score 3<br>None spotted

Authorities & Utility Companies

(AU 01) Water Supply e.g. SYABAS

  • Score 0<br>No consistent of water supply<br><br>Score 1<br>Consistent water supply<br><br>Score 2<br>1. Consistent water supply<br>2. AND No leakage<br><br>Score 3<br>1. Consistent water supply<br>2. AND No leakage<br>3. AND Well maintain

(AU 02) Electricity Supply e.g. TNB

  • Score 0<br>No consistency of electricity supply<br><br>Score 1<br>Consistent electricity supply <br><br>Score 2<br>1. Consistent electricity supply<br>2. AND PMU box well maintain<br><br>Score 3<br>1. Consistent electricity supply<br>2. AND PMU box well maintain<br>3. AND Creative landscaping

(AU 03) Sewage Treatment Plan (STP) e.g. IWK

  • Score 0<br>Not available<br><br>Score 1<br>Available<br><br>Score 2<br>1. Available<br>2. AND STP well maintain<br><br>Score 3<br>1. Available<br>2. AND STP well maintain<br>3. AND Creative landscaping

Environment

  • Contsruction

(EV 01) Dust Control

  • Score 0<br>No BMPs implemented<br><br>Score1 <br>Any BMPs implemented<br><br>Score 2<br>1. Any BMPs implemented<br>2. AND Well maintain<br><br>Score 3<br>1. Any BMPs implemented<br>2. AND Well maintain<br>3. AND Use natural water source/ Use recycle water

(EV 02) Noise Control

  • Score 0<br>No BMPs implemented<br>Score 1<br>Any BMPs implemented<br><br>Score 2<br>1. Any BMPs implemented<br>2. AND Well maintain<br><br>Score 3<br>1. Any BMPs implemented<br>2. AND Well maintain<br>3. AND Signage

(EV 03) Water Quality Control

  • Score 0<br>No BMPs implemented<br><br>Score 1<br>Any BMPs implemented<br><br>Score 2<br>1. Any BMPs implemented<br>2. AND Well maintain<br><br>Score 3<br>1. Any BMPs implemented<br>2. AND Well maintain<br>3. AND Water at discharge point clear/ within limit

(EV 04) Waste Management - waste handling

  • Score 0<br>No proper segregation<br><br>Score 1<br>Proper segregation of construction and domestic waste<br><br>Score 2<br>1. Proper segregation of construction and domestic waste<br>2. AND Recycling bin provided with proper separation<br><br>Score 3<br>1. Proper segregation of construction and domestic waste<br>2. AND Recycling bin provided with proper separation<br>3. AND Weighting waste produce

(EV 05) Waste Management - usage of recycled, renewable and recyclable materials

  • Score 0<br>0 element<br><br>Score 1<br>1 element by material source<br><br>Score 2<br>2 elements by material source<br><br>Score 3<br>3 elements by material source

(EV 06) Spillage Management

  • Score 0<br>No proper spillage management<br><br>Score 1<br>Proper oil containment/ tray/ bund<br><br>Score 2<br>1. Proper oil containment/ tray<br>2. AND SW408 container available<br><br>Score 3<br>1. Proper oil containment/ tray<br>2. AND SW408 container available<br>3. AND No major/unattended spillage

(EV 07) Energy saving initiatives at construction site e.g. use biodiesel for gen-set/ other machinery

  • Township

(EV 08) Energy saving initiatives at township surrounding

  • Score 0<br>No application of energy control measure<br>Score 1<br>Application of 1 energy control measure<br><br>Score 2<br>Application of 2 energy control measures<br><br>Score 3<br>Application of 3 energy control measures

(EV 09) Erosion & Sediment Control Plan (ESCP)

  • Score 0<br>No BMPs implemented<br><br>Score 1<br>Any BMPs implemented<br><br>Score 2<br>1. Any BMPs implemented<br>2. AND Well maintain<br><br>Score 3<br>1. Any BMPs implemented<br>2. AND Well maintain<br>3. AND No erosion & sediment spotted

Health

  • Construction Site

(HE 01) Control of breeding of flies -rubbish dump

  • Score 0<br>Spotted at more than 3 areas by site<br><br>Score 1<br>Spotted at 3 areas by site<br><br>Score 2<br>Spotted at 2 area by site<br><br>Score 3<br>None spotted

(HE 02) Control of mosquito breeding –stagnant water in holes, cans & pits

  • Score 0<br>Spotted at more than 3 areas by site<br><br>Score 1<br>Spotted at 3 areas by site<br><br>Score 2<br>Spotted at 2 area by site<br><br>Score 3<br>None spotted

(HE 03) Schedule Waste Storage

  • Score 0<br>No proper management<br><br>Score 1<br>1. Proper designated SW area with ramp, hoarding, roof, bund & lock<br>2. OR Fire extinguisher ready<br>3. OR Proper signage & labeling<br><br>Score 2<br>1. Proper designated SW area with ramp, hoarding, roof, bund & lock<br>2. AND Fire extinguisher ready<br>3. OR Proper signage & labeling<br><br>Score 3<br>1. Proper designated SW area with ramp, hoarding, roof, bund & lock<br>2. AND Fire extinguisher ready<br>3. AND Proper signage & labeling

  • Township

(HE 04) Health and wellness features

  • Score 0<br><2 elements<br><br>Score 1<br>2 elements<br><br>Score 2<br>3 elements<br><br>Score 3<br>4 elements

Safety

(SA 01) Greenzone

  • Score 0<br>Greenzone area not available<br><br>Score 1<br>Established Greenzone area<br><br>Score 2<br>1. Established Greenzone area<br>2. AND Greenzone under construction<br><br>Score 3<br>1. Established Greenzone area<br>2. AND Greenzone fully-operated

(SA 02) Safe operation

  • Score 0<br>Spotted >3 unsafe operation<br><br>Score 1<br>Spotted 3 unsafe operation<br><br>Score 2<br>Spotted 2 unsafe operation<br><br>Score 3<br>None spotted

(SA 03) Emergency Kit

  • Score 0<br>No Safety & Health Officer on site<br><br>Score 1<br>1. Safety & Health Officer on-site<br>2. OR First aid kit available & on-site<br>3. OR ERP poster/signage available<br><br>Score 2<br>1. Safety & Health Officer on-site<br>2. AND First aid kit available & on-site<br>3. OR ERP poster/signage available<br><br>Score 3<br>1. Safety & Health Officer on-site<br>2. AND First aid kit available & on-site<br>3. AND ERP poster/signage available

(SA 04) User friendly & safety features e.g. parking for OKU

  • Score 0<br><2 elements<br><br>Score 1<br>2 elements<br><br>Score 2<br>4 elements<br><br>Score 3<br>6 elements

Community Civic Amenities

(CO 01) Recreational area: Playground, parks, green areas, pond, lakes

(CO 02) Mosques & place of worship

  • Score 0<br>Not available<br><br>Score 1<br>Under planning<br><br>Score 1<br>Under construction<br><br>Score 3<br>Ready

(CO 03) Public transport station

  • Score 0<br>Not available<br><br>Score 1<br>Under planning<br><br>Score 1<br>Under construction<br><br>Score 3<br>Ready

(CO 04) Commercial

(EX 01) Sustainability corner at Sales gallery

  • Score 0<br>Not available<br><br>Score 1<br>1. Corner<br>2. OR Interior Design<br><br><br>Score 2<br>1. Corner<br>2. AND Interior Design<br><br>Score 3<br>1. Corner<br>2. AND Interior Design<br>3. AND Sustainability reading materials/ Collaterals

(EX 02) Special environmental elements e.g. ACWS

  • Score 0<br>0 element<br><br>Score 1<br>1 element<br><br>Score 2<br>2 elements<br><br>Score 3<br>3 elements

General Cleanliness

(GE 01) Construction site

  • Score 0<br>No proper maintenance <br><br>Score 1<br>Somehow clean but need immediate improvement<br><br>Score 2<br>Generally Clean<br><br>Score 3<br>Clean & Tidy

(GE 02) Private Area

  • Score 0<br>No proper maintenance <br><br>Score 1<br>Somehow clean but need immediate improvement<br><br>Score 2<br>Generally Clean<br><br>Score 3<br>Clean & Tidy

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.