Title Page

  • Site conducted

  • Customer Name

  • Prepared by

  • Conducted on

  • Location

Pre Start

  • Wide photo of existing board location

  • Photos of existing SWB and all existing apparatus. (Meters, circuit protection, cable entries)

  • Is the customer aware of the new SWB location?

  • Is the the new SWB staying in the same location as the old SWB?

  • Where is the new SWB location?

  • Why not?

  • Will there be any left over marks/holes from the old SWB?

  • Is the customer aware?

  • Why not?

  • Is a HWT to be installed?

  • Is it included in the job description?

  • How is the customer paying?

  • Does the customer have any other concerns or questions?

  • Have they all been answered?

  • Why not?

  • Why N/A?

  • Is the Customer home to sign?

  • Customer Signature.

  • Electrician Signature.

  • Why not?

  • Electrician Signature

Post Completion

Photos

  • Wide photo of new SWB.

  • Photo of SWB open.

  • Close up photo of all meters.

  • Photo of all penetrations sealed. (O-ring, plain to screw etc.)

  • Close up of all circuit protection devices. (Correctly Labelled)

  • Photo of meter neutral link.

  • Photo of main neutral link.

  • Photo of earth link.

  • Photo of M.E.N

  • Picture of main switch.

  • Picture of solar main switch.

  • Picture of isolation link.

  • Photo of all solar stickers.

  • Is there any mark/holes from the old SWB?

  • Photos of marks/holes

Double check

  • Visual inspection.

  • Why not?

  • All terminals adequately tightened?

  • Why not?

  • Correct Polarity

  • Why not?

  • Are all circuits functioning correctly?

  • Why not?

Finishing Up

  • COC completed?

  • Why not?

  • Is the existing meter a smart meter?

  • Leave solar MS on and inform customer that solar is up and running.

  • Leave solar MS off and inform the customer about their meter change over.
    - 2-3 weeks
    - Will need access to SWB
    - Retailer will relay date and time with customer
    - Etc.

  • Does the customer have any other questions or concerns?

  • Have they been answered?

  • Why not?

  • Is the customer happy to finalise the invoice?

  • Why not?

  • Why N/A?

  • Is the customer around to sign?

  • Why not?

  • Electrician Signature.

  • Customer Signature.

  • Electrician Signature.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.