Title Page
General Information
-
DA number?
-
Inground or above ground?
-
PS Number
-
Date of inspection?
-
Address of inspection?
Pool compliance
-
Is the proposed site in accordance with stamped approved plans?
-
Is the mesh size in accordance with engineers detail?
-
Is cover provided from mesh to swimming pool?
-
Has the earth wire been connected?
-
Has a sign indicating 'the swimming pool is not to be occupied or used' been provided?
-
Has a CPR sign been installed?
-
Has the temporary fence been installed?
-
Has notice of commencement been provided?
-
Has the Principal Certifying Authority been provided?
Final
-
Comments
-
Inspector