Title Page

General Information

  • Date of inspection

  • Address of inspection

  • DA number?

  • LG number

  • Is the main line vent between last and 2nd last fixture?

  • Is branch line less than 10m long?

  • Is a vent installed?

  • Has the shower been trapped?

  • Is there a floor waste in the laundry?

  • Has a gully been installed on the mane line? (charged by a fixture)

  • Does the floor waste and gully have concrete underneath them?

  • Has the correct fall been provided?

  • Is there a direct line to the toilet for rodding purposes?

  • Is 7-10mm stone backfilled around pipes?

  • Are all fixtures 100mm through the slab?

  • Are the pipes under test?

  • Has a notice of works been submitted?

  • Is the inspection satisfactory?

Final

  • Comments

  • Inspector

  • Anyone else in attendance?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.