Construction Details

  • Quilpie Shire Council, PO Box 50 Quilpie QLD 4480, Phone 07 4656 0500, ABN:53 680 434 639

  • Principal Contractor

  • Details if QSC is not the Principal Contractor

  • Document Number:

  • Work Location

  • Select High Risk Construction Work

  • Select Construction Work Activity

  • Select Road Maintenance Work Activities

  • Select Concrete Work Activities

  • Select Town Services Activities

  • Select Sign Crew Activities

  • Do you require a spotter - working in an exclusion zone

  • Person responsible for SWMS:

  • Date SWMS created:

  • Prepared by

Inspection

  • What measures are in place to ensure compliance with the SWMS?

Risk Management

  • Selecting control measures
    1. Eliminate the risks, so far as is reasonable practicable.
    2. If this is not reasonably practicable, minimise them so far as reasonably practicable by:
    • substituting the hazard
    • isolating the hazard
    • implementing engineering controls.
    3. If the risk still remains, minimise it further by implementing administrative controls.
    4. If the risk still remains, minimise it by ensuring the provision and use of suitable personal protective equipment (PPE).

    1200px-NIOSH’s_“Hierarchy_of_Controls_infographic”_as_SVG.svg.png
  • Select High Risk powered mobile plant used.

  • Are all operators Licenced or competent to operate the required plant?

  • List any hazardous chemicals if used on site

  • Are SDS (Safety Data Sheets) available

  • Are supervision arrangements organised for inexperienced and young workers?

  • List the work tasks/process in a logical order

  • Select the hazards and risks (Identify & list the hazards and risks that may cause harm to workers or the public) Add additional hazards/risk in notes

  • List any other hazards and risks

  • List the control measures to control the hazards & risks? (Describe what will be done to control the risk. What will you do to make the activity as safe as possible?)

  • If required select the appropriate PPE

  • Rate the likelyhood of exposure

  • Rate the risk level with controls in place

  • Is it safe to proceed?

  • Date SWMS received by workers:

Review: all workers involved in this high-risk construction work have been provided with the relevant information and instruction that will assist them to understand and implement the revised SWMS

This SWMS has been reviewed for this particular construction project. (Add all worker's names & signatures below)

  • Manager/Supervisor

  • Select name of workers

  • Signatures

  • Date

  • Name of contractors

  • Signatures

  • Name of person completing this SWMS

  • Reviewed by:

  • Review date:

  • Additional Notes:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.