Title Page

  • Document No.

  • Airline

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Ramp Lead Name:

  • TCO Name:

Ramp Lead

  • Does the ramp lead have a copy Loading Instructions Report Form (LIRF)?

  • Does the ramp lead check each ULD (number, weight, and type) prior to loading?

  • Does the loader operator have a copy of the LIRF?

  • Does the loader operator check ULD numbers and cross checks with LIRF?

  • Does the ramp lead check the locks inside the holds before closing the cargo door?

  • Does the ramp lead check compartment 5 (H5) and notes all items (number of bags, gate checks, crew bags, cargo, etc.) on LIRF?

TCO (Turnaround Coordinator)

  • Does the TCO have a copy of the Loading Instructions Report Form (LIRF)?

  • Does the TCO check each ULD (number, weight, and type) prior to loading?

  • Does the TCO check each HOLD before loading begins?

  • Does the TCO verify contents in compartment 5 (H5) (number of bags, gate checks, crew bags, cargo etc.)?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.