Title Page
-
Inspector name and title
-
Inspection Date
-
Location (canal, yard, project)
-
Post storm inspection
-
14 day inspection
-
7 day inspection
-
Current weather conditions
-
Date since last inspection
-
Rainfall (inches)
Construction Activities
Current Grading Activities
-
Describe the current grading activities and document with a photo
-
Grading activity 1 name
-
Date activity 1 started
-
Photo 1
-
Stabilization date or projected date
-
Grading activity 2 name
-
Date activity 2 started
-
Photo 2
-
Stabilization date or projected date
-
Grading activity 3 name
-
Date activity 3 started
-
Photo 3
-
Stabilization date or projected date
Discharges
Discharges noted
-
Include any dewatering activities on site
-
Any discharges noted?
-
Note the location of the discharge, color, etc.
-
Photo 1
-
Photo 2
-
Photo 3
BMPs
BMPs
-
Additional BMPs needed. Add photos here
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Maintenance- any repairs or replacements noted here w photos
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
Other
-
Are Changes to the SWPPP required?
-
Reasons for change
-
Inspectors signature
-
Signature in accordance with LAR100000 part VI.G