Title Page
-
Site conducted
-
Conducted on
-
Conducted by
-
Location
PLATFORM 0
-
Tanking Point 1 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 1 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 2 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 2 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 3 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 3 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 4 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 4 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 5 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 5 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 6 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 6 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 7 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 7 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 8 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 8 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 9 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 9 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 10 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 10 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 11 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 11 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 12 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 12 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 13 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 13 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 14 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 14 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 15 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 15 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 16 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 16 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 17 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 17 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 18 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 18 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 19 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 19 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 20 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 20 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 21 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 21 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 22 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 22 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 23 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 23 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
PLATFORM 1
-
Tanking Point 1 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 1 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 2 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 2 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 3 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 3 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 4 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 4 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 5 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 5 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 6 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 6 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 7 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 7 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 8 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 8 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 9 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 9 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 10 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 10 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 11 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 11 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 12 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 12 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 13 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 13 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 14 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 14 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 15 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 15 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 16 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 16 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 17 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 17 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 18 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 18 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 19 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 19 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 20 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 20 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 21 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 21 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 22 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 22 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 23 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 23 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
PLATFORM 2
-
Tanking Point 1 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 1 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 2 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 2 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 3 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 3 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 4 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 4 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 5 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 5 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 6 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 6 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 7 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 7 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 8 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 8 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 9 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 9 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 10 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 10 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 11 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 11 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 12 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 12 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 13 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 13 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 14 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 14 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 15 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 15 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 16 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 16 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 17 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 17 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 18 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 18 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 19 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 19 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 20 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 20 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 21 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 21 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 22 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 22 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 23 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 23 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
PLATFORM 3
-
Tanking Point 1 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 1 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 2 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 2 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 3 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 3 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 4 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 4 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 5 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 5 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 6 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 6 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 7 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 7 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 8 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 8 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 9 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 9 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 10 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 10 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 11 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 11 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 12 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 12 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 13 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 13 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 14 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 14 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 15 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 15 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 16 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 16 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 17 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 17 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 18 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 18 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 19 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 19 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 20 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 20 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 21 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 21 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 22 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 22 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 23 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 23 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
PLATFORM 4
-
Tanking Point 1 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 1 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 2 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 2 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 3 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 3 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 4 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 4 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 5 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 5 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 6 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 6 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 7 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 7 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 8 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 8 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 9 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 9 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 10 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 10 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 11 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 11 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 12 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 12 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 13 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 13 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 14 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 14 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 15 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 15 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 16 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 16 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 17 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 17 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 18 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 18 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 19 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 19 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 20 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 20 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 21 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 21 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 22 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 22 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 23 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 23 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
PLATFORM 5
-
Tanking Point 1 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 1 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 2 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 2 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 3 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 3 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 4 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 4 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 5 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 5 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 6 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 6 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 7 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 7 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 8 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 8 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 9 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 9 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 10 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 10 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 11 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 11 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 12 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 12 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 13 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 13 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 14 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 14 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 15 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 15 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 16 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 16 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 17 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 17 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 18 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 18 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 19 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 19 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 20 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 20 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 21 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 21 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 22 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 22 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 23 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 23 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
PLATFORM 6
-
Tanking Point 1 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 1 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 2 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 2 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 3 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 3 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 4 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 4 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 5 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 5 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 6 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 6 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 7 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 7 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 8 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 8 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 9 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 9 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 10 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 10 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 11 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 11 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 12 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 12 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 13 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 13 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 14 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 14 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 15 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 15 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 16 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 16 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 17 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 17 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 18 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 18 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 19 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 19 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 20 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 20 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 21 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 21 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 22 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 22 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 23 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 23 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
PLATFORM 7
-
Tanking Point 1 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 1 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 2 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 2 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 3 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 3 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 4 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 4 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 5 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 5 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 6 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 6 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 7 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 7 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 8 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 8 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 9 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 9 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 10 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 10 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 11 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 11 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 12 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 12 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 13 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 13 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 14 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 14 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 15 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 15 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 16 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 16 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 17 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 17 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 18 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 18 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 19 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 19 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 20 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 20 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 21 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 21 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 22 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 22 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 23 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 23 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
PLATFORM 8
-
Tanking Point 1 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 1 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 2 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 2 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 3 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 3 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 4 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 4 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 5 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 5 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 6 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 6 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 7 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 7 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 8 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 8 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 9 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 9 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 10 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 10 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 11 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 11 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 12 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 12 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 13 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 13 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 14 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 14 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 15 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 15 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 16 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 16 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 17 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 17 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 18 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 18 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 19 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 19 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 20 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 20 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 21 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 21 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 22 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 22 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
-
Tanking Point 23 checked
-
Were any issues/faults identified?
-
Please select the issue by type and then provide an explanation. Every issue identified must have a corresponding action to address and/or improve.
-
Tanking Point 23 Identified Issues
- Level 1 - No Pipe Connection
- Level 1 - Tanking Hydraulic Lid Arm Broken
- Level 1 - Lid Needs Repairing - Drop Down
- Level 1 - Elevated TPC - Trip Hazard
- Level 1 - Tanking Lid cannot open
- Level 1 - Dosing Tray Leaking
- Level 1 - Turn ON/OFF Valve Full Part Replacement
- Level 1 - Dosing Tray Missing
- Level 1 - Hose Missing
- Level 1 - Leak from Supply Pipe (Not tanking hose)
- Level 1 - Sharp Edges -TPC
- Level 2 - Turn ON/OFF Valve replacement
- Level 2 - Hose Damaged
- Level 2 - Pipe Clamp Needs Refitting/ Replacement
- Level 1 - Tanking Hydraulic Lid Arm Missing
-
Employees are required to conduct tasks with due care and attention and maintain a safety distance from the platform edge. All activities must be conducted safely and in line with the specifications and TB-RAMS.
-
Please explain the issue in your own words.
-
SOCOTEC testing conducted
-
Test Results / Access Issues
-
Resolution Actions
-
Conducted by:
-
Conducted on:
SIGN OFF
-
SIGNATURE